Method for optimizing and balancing power-cut schemes

A power outage planning and balancing technology, applied in the field of analysis and application, can solve the problems of integration and integration, increase errors, waste human resources and inspection time, etc., to improve the reliability of power supply, reduce the number of power outages, and reduce potential safety hazards.

Inactive Publication Date: 2014-11-19
STATE GRID CORP OF CHINA +2
View PDF1 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the power outage plan arrangement of electric power enterprises is mainly based on manual work. The professional technical ability, work experience, and sense of responsibility of the relevant personnel are directly related to the quality of the outage plan, which may cause inappropriate workload arrangements, resulting in dispatching personnel and maintenance Personnel are sometimes overwhelmed, which increases the chance of errors i

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for optimizing and balancing power-cut schemes
  • Method for optimizing and balancing power-cut schemes
  • Method for optimizing and balancing power-cut schemes

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0057] The present invention will now be described in detail with reference to the drawings and specific embodiments.

[0058] The method for optimizing and balancing a power outage plan of the present invention includes the following steps:

[0059] 1. Carry out safety analysis and inspection of the power outage plan, and timely carry out safety warning before the execution of the plan. figure 1 Shown, including the following aspects:

[0060] (1) Maintenance of power outage plan information

[0061] To enter and maintain the monthly power outage plan information, you can import the monthly power outage plan of the distribution network from the PMS system, or use the tool window of the power outage plan information maintenance tool to manually add the monthly power outage plan information in combination with the GIS equipment topology information.

[0062] (2) Maintenance of power-guarantee task information

[0063] To enter and maintain power-saving task information, you can synchroniz...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for optimizing and balancing power-cut schemes. The method includes the steps that firstly, safety analysis checking is conducted on the drafted power-cut schemes, probably-caused safety risks and reliability of the power-cut schemes are comprehensively evaluated and analyzed, safety early warning is conducted in time before the schemes are executed, and therefore potential safety hazards are reduced; the power-cut schemes passing safety analysis checking are kneaded and analyzed, the power-cut schemes with the overlapped power-cut ranges are kneaded, the number of power-cut times of users is reduced, and therefore power supply reliability is improved; scheduling analysis is conducted on the kneaded power-cut schemes, the power-cut schemes of different types such as overhauls, service expansion and defects are comprehensively considered, factors such as holidays and festivals, electricity protection tasks and important users are considered in the scheduling process, dispatching, work area and construction unit workloads are distributed in a balanced mode, and a scientific power-cut time arrangement scheme is proposed.

Description

technical field [0001] The invention relates to a method for optimizing a balanced power outage plan, and belongs to the technical field of analysis and application in distribution automation / information systems. Background technique [0002] The management of power outage plan is an important business of power supply enterprises, which is related to the safe and reliable operation of the power grid as well as economic and social benefits. As the scale of the power grid continues to increase, the number of equipment increases, and the power load also increases rapidly. The complexity of power outage management becomes higher and higher. At the same time, users have more and more requirements for power supply reliability and power supply quality. High, which puts forward higher requirements for power outage management level. [0003] The business process of power outage plan management is relatively complicated. At present, most power companies have established a power outag...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06Q50/06
CPCY02E40/70Y04S10/50
Inventor 吴琳谭勇桂何安宏吴雪琼曹连连冯颖张可新王纪军程伟华谭晶
Owner STATE GRID CORP OF CHINA
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products