Blowout Prevention Construction Method for Mine Borehole Pressure Relief
A construction method and blowout prevention technology, which is applied in earth-moving drilling, wellbore/well components, sealing/packaging, etc., can solve the problems of uncontinuable drilling construction, drilling blowout holes, and injury to construction personnel, etc. Coal and rock particle splashing problem, improving safety and solving the effect of gas impact problem
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] Such as figure 1 The anti-blowout and anti-scour construction method when the mine borehole pressure relief shown in Fig. 2 includes:
[0013] The first step is to take two steel pipes with the same diameter. The diameter of the steel pipe is 2-3 times larger than the diameter of the drilled hole. The opposite ends of the two steel pipes are respectively welded to the corresponding flanges 3; one of them is used as the hole for inserting into the drilled hole The fixed pipe 2, the other section is used as the blowout preventer 1 outside the hole, and the circular plate 4 with a socket is welded on one end of the blowout preventer 1. It is required that the diameter of the hole should just pass through the drill bit, and the blowout preventer 1 faces downward. 2-4 pressure relief holes are processed on the side of each pressure relief hole, and a protective pipe 5 is welded on each pressure relief hole;
[0014] The second step is to open an installation hole 7 whose di...