A coal mine auxiliary shaft pipeline structure and its construction method
A construction method and a technology for a pipe channel, which are applied in the field of coal mine roadway construction, can solve problems such as damage, threat to mine safety production, instability, etc., and achieve the effects of ensuring project safety, wide practicability and easy operability, and reducing total construction cost.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] The length of the pipeline roadway is 8-10m. When the wellbore is constructed to the position of the pipeline road, the entire length of the pipeline roadway section will be constructed at one time. Firstly, anchor rods, steel mesh and shotcrete will be used for primary support, and then it will be supported with the connected well. The wall is integrally poured with reinforced concrete for permanent support. Change the current method of first constructing 1-2m, and then pass through the remaining part of the inclined roadway and transitional roadway construction, so that the impact on the connected well wall and the lower horse head gate body during the second construction of the remaining part of the pipeline roadway can be greatly reduced and eliminated. disturbance effect; the length of the pipeline transitional entry is increased from the current 3m to 10m, which increases the distance between the inclined roadway of the pipeline and the shaft wall and the horse hea...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 