Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

21results about How to "Ensure engineering safety" patented technology

Underground diaphragm wall construction period optimization method

The invention relates to an underground diaphragm wall construction period optimization method, and belongs to the technical field of underground diaphragm wall construction. The underground diaphragm wall construction period optimization method comprises the following steps that according to geological survey data, the thickness and the soil property of each soil layer are counted, and feasible grooving machine combinations are listed; according to a supporting structure design scheme of the underground diaphragm wall, a construction area and a construction sequence are planned; carrying out secondary design on the underground diaphragm wall; the secondary design comprises groove section splitting, joint arrangement and groove forming width adjustment; analyzing and counting the work efficiency of each grooving machine combination, and determining an alternative grooving machine combination; obtaining the construction efficiency of each alternative grooving machine combination under different groove sections; key procedures and resource investment under different grooving machine combinations are analyzed, and grooving machines are selected; and making a construction plan. According to the method, through reasonable equipment selection, optimized construction planning and accurate construction period control, the construction efficiency is effectively improved, the construction period is shortened, and meanwhile the construction cost is reduced.
Owner:NO 1 ENG COMPANY CO LTD OF CCCC FIRST HARBOR ENG COMPANY +1

Platform vibration monitoring system based on offshore engineering and monitoring method thereof

The invention discloses a platform vibration monitoring system based on offshore engineering and a monitoring method thereof. The monitoring system comprises a base station control cabinet and monitoring subsystems. The monitoring subsystem comprises an encircling mounting mechanism, a pose adjusting mechanism and a unit monitoring box. The monitoring method comprises the following steps: carrying out anti-seismic capacity grading, collecting acceleration data, temperature data and seismological observation data, preprocessing the data, calculating platform vibration data and obtaining a data classification result, sending corresponding platform maintenance instructions in a grading manner, and carrying out initialization recovery adjustment on the pose of the unit monitoring box. According to the platform vibration monitoring system and the monitoring method thereof, multi-point vibration monitoring based on offshore engineering can be realized, the reliability and the comprehensiveness of vibration monitoring are ensured, and a guarantee is provided for realizing the safety and the reliability of the offshore engineering; and the pose of the unit monitoring box can be autonomously adjusted, and maintenance personnel do not need to regularly rush to the site for adjustment and confirmation.
Owner:JIANGSU EARTHQUAKE ADMINISTRATION +1

Single-wall steel open caisson with T-shaped ribs and construction method thereof

The invention provides a single-wall steel open caisson with T-shaped ribs and a construction method of the single-wall steel open caisson. The single-wall steel open caisson comprises a plurality of single-section steel open caisson bodies assembled in the longitudinal direction. Each single-section steel open caisson comprises a circular steel open caisson, a plurality of T-shaped stiffening ribs and a plurality of anti-drag grouting pipes, wherein the T-shaped stiffening ribs are evenly arranged on the outer wall of the circular steel open caisson in the circumferential direction at intervals, and the anti-drag grouting pipes are arranged on the inner wall of the circular steel open caisson. Based on the change of the section form of the single-wall steel open caisson, the T-shaped stiffening ribs are arranged on the outer wall of the circular steel open caisson, so that the strength and rigidity of the whole single-wall steel open caisson structure are enhanced; the problems that due to insufficient rigidity and large load effect of an existing single-wall steel open caisson, lateral displacement of the open caisson is large, local stress of the open caisson wall is concentrated, and stability is insufficient are solved, the pressing depth and engineering safety of the steel open caisson are ensured, and the steel open caisson is supported to be further developed towards the longitudinal depth.
Owner:SHANGHAI FOUNDATION ENGINEERING GROUP CO LTD

Anti-sliding key structure, implementation method thereof and landslide treatment method

The invention discloses an anti-sliding key structure which comprises a plurality of miniature steel pipe grouting piles and pressure grouting piles, each miniature steel pipe grouting pile comprises a first cement column, two miniature steel pipes welded side by side are arranged in each first cement column, and the bottoms of the miniature steel pipes are flush with the bottom of each first cement column. The invention further discloses an implementation method of the anti-sliding key structure. The implementation method comprises the following steps that a steel pipe pile hole and a pressure grouting hole are drilled in the rear edge position of a landslide; pouring cement paste into the steel pipe pile hole and the pressure grouting hole; two micro steel pipes welded side by side are pressed into the first cement column to the bottom end of the first cement column, and a micro steel pipe grouting pile is formed; and after the cement paste is solidified, an anti-sliding key structure is formed. The invention further discloses a landslide treatment method, 20-40 sets of anti-sliding key structures are implemented on the rear edge of the landslide, the distance between every two adjacent sets of anti-sliding key structures ranges from 4 m to 6 m, and the anti-sliding key structure sets are arranged in a V shape on the plane. The anti-sliding key structure can increase the depth of a sliding surface and reduce the sliding force and the deformation rate of a landslide.
Owner:中煤西安设计工程有限责任公司

A long anchor cable anchoring quality detection method and monitoring system

The present invention relates to the field of monitoring, and discloses a long anchor cable anchoring quality detection method and monitoring system, wherein the anchoring mesh of the area to be tested is obtained, and the long anchor cable sequence corresponding to the anchoring mesh is obtained, and the cloud data server generates a detection management container according to the long anchor cable anchoring quality detection task; the long anchor cable anchoring detection device obtains the long anchor cable detection index data corresponding to the anchoring mesh according to the detection index in the long anchor cable anchoring quality detection task; according to the set detection cycle, the long anchor cable anchoring detection device collects the detection index data of the long anchor cable according to the detection index, and obtains the long anchor cable detection index data within the detection cycle, if there is no abnormal long anchor cable, then the detection index change amount corresponding to the anchoring mesh is obtained, and the attenuation consistency of the attenuation degree of each long anchor cable corresponding to the anchoring mesh is obtained, and the long anchor cable anchoring quality detection is completed. Compared with traditional manual detection and simple physical testing methods, the present invention has higher detection accuracy and reliability.
Owner:DEYANG HAOHUA QINGPING PHOSPHATE CO LTD

A hanger plate device for a flower basket type cantilever steel beam

The present application belongs to the technical field of building engineering, and particularly relates to a lug plate device for a flower basket type cantilever steel beam, which comprises: a main component, which is sleeved on the flower basket type cantilever steel beam; a lug plate, which is fixedly connected above the main component; and at least one adjusting and fastening mechanism, which is arranged on the main component and is used for detachably and adjustably fixing the main component and the lug plate on the steel beam in the length direction of the steel beam by applying clamping force to the steel beam. The present application solves the position conflict adjustment problem: when the lug plate position conflicts with a vertical rod or the like, the lug plate can be easily moved and adjusted in position by loosening the bolts without cutting and re-welding, and the operation is extremely convenient.
Owner:THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU

Offshore wind power foundation scour protection filling reinforcement construction device and method

The present invention discloses an offshore wind power foundation scour protection filling reinforcement construction device and method. The on-site construction device and construction method are described in detail for different working conditions such as scour depth, speed and scour form, solving the problem that traditional technology is difficult to adapt to local conditions; through pre-construction detection, the optimal filling material and proportion under different working conditions are selected. A new type of double-layer slurry on-site transportation pipeline device is designed and applied, and both single-liquid slurry and double-liquid slurry can be used; an annular buckle device on the wind power pile foundation and a claw-shaped support device extending into the seabed are designed and applied to flexibly adjust the filling angle of the transportation pipeline, avoiding the shaking of the transportation pipeline and the construction ship during the construction process and affecting the safety of the pile foundation; using a depth detection sensor to automatically control the flow of the slurry to achieve accurate filling of grouting materials with a high degree of automation.
Owner:OCEAN UNIV OF CHINA

Downhole instrument creep detection method based on multi-source sensor fusion

The application discloses a downhole instrument creep detection method based on multi-source sensor fusion and relates to the technical field of oil and gas well engineering, which comprises the following steps: obtaining sensor data of a target instrument in a target downhole preset period and preprocessing the sensor data to obtain preprocessed sensor data; performing magnetic interference detection based on the preprocessed sensor data to obtain a first detection result; performing multi-source joint likelihood ratio test based on the first detection result and the preprocessed sensor data to obtain a second detection result; when the second detection result meets the requirements, performing accelerometer variance detection and fiber-optic gyroscope output energy detection based on the preprocessed sensor data to obtain a third detection result; when the third detection result meets the requirements, constructing a long-period observation window and obtaining a second variance based on the preprocessed sensor data; and determining a creep termination time based on the second variance and the long-period observation window. The application realizes sensitive capture of small creep movement of a downhole instrument and further obtains an accurate creep time of the downhole instrument.
Owner:BEIHANG UNIV

Zero-vibration-sense and micro-vibration-velocity fine blasting construction method for urban complex environment

The invention relates to the field of building construction, in particular to a zero-vibration-sense and micro-vibration-velocity fine blasting construction method for an urban complex environment, which realizes high efficiency, safety and environmental protection of blasting construction through the technical means of geological investigation and environment evaluation, accurate design of blasting parameters, digital intelligent construction management, interval charging of water bags, automatic vibration velocity monitoring, wrong item damping and the like. By means of precise control over blasting energy and precise management over the construction process, blasting vibration, noise and dust are effectively controlled, and the influence on the surrounding environment is reduced. The method has the advantages that construction efficiency and quality are improved, economic benefits and social benefits are remarkably improved, and a new way is provided for safe and green development of urban underground space.
Owner:CHINA COMMUNICATIONS CONSTRUCTION +9

Comprehensive test board for mechanical property of anchor rod

The utility model discloses an anchor rod mechanical property comprehensive testboard in the technical field of anchor rod mechanical tests, which comprises an anchor rod and a testboard, the testboard comprises a rotating base, a transverse moving frame and a rotating frame, the rotating base comprises a first V-shaped rod and a second V-shaped rod, and the first V-shaped rod and the second V-shaped rod are in running fit. Moving rods are fixedly mounted at the tail ends of the first V-shaped rod and the second V-shaped rod, a transverse moving frame is in sliding fit with inner cavities of the moving rods and comprises a floor, a fixing frame is fixedly inserted into the top of the floor and comprises a first outer frame and a second outer frame, and the first outer frame and the second outer frame are fixedly connected through small shafts at the four corners; the outer wall of the small shaft is sleeved with a roller, the roller is rotationally matched with the small shaft, the rotating frame comprises a rotating disc, the outer wall of the rotating disc is matched with the roller, outer teeth are evenly arranged in the middle of the outer wall of the rotating disc, and conical surfaces are arranged at the outer ends of the two sides of the rotating disc. And the multi-directional pressure test of the mechanical property of the complex stress combination of the anchor rod is facilitated.
Owner:YANKUANG ENERGY GRP CO LTD

Autoclaved aerated concrete thermal insulation structure integrated wall

The utility model discloses an autoclaved aerated concrete thermal insulation structure integrated wall body which comprises an inner wall plate and an outer wall plate, a thermal insulation plate is arranged between the inner wall plate and the outer wall plate, and an assembly structure used for installing the wall body is arranged on the thermal insulation plate. The assembly structure comprises a protruding part and a concave part which are correspondingly arranged on the opposite end faces of the heat preservation plate, the protruding part and the concave part are matched in an inserted mode, and a protection structure is arranged corresponding to the assembly structure. The protective structure is arranged, so that the assembly structure is effectively protected, the risk that the assembly structure is collided and damaged is reduced, and the damage rate of a wall is reduced; the inner wall plate and the outer wall plate which are made of autoclaved aerated concrete reduce the building volume weight and save the engineering material cost; by arranging a sealing gasket, the air tightness of wall assembly is improved, and the heat preservation performance of the wall is improved; due to the arrangement of the broken bridge tie piece, the integrated strength of the wall body is improved, the layering and falling risks of the wall body are effectively reduced, and the quality of the wall body and the engineering safety are guaranteed.
Owner:QINHUANGDAO FUHAIYUAN PREFABRICATED NEW BUILDING MATERIALS CO LTD

Multi-channel pile foundation detection equipment based on side hole transmission wave method

The utility model provides multichannel pile foundation detection equipment based on a side hole transmission wave method, which belongs to the technical field of building detection and comprises a transport case, partition plates are mounted in an inner cavity of the transport case, and the inner cavity of the transport case is divided into a first cavity, a second cavity and a third cavity by the partition plates. The bottom of one side of the transport box is provided with a moving mechanism used for moving the transport box so as to facilitate transfer, and the first cavity is internally provided with a seismic wave source assembly used for detecting the pile foundation. The utility model has the beneficial effects that a pile foundation can be hammered through the seismic wave source assembly to generate vibration so as to form mechanical waves, and then the generated mechanical waves can be collected and analyzed through the composite multi-channel collection assembly and the data analysis assembly, so that data collection and analysis are integrated; the length of the pile foundation is detected in real time with high precision and high efficiency, reliable data is provided for follow-up engineering construction safety, and engineering quality and safety are guaranteed.
Owner:TIANJIN SURVEY DESIGN INST GRP CO LTD

Special equipment erecting control system with locking mechanism

The utility model discloses a special equipment erecting control system with a locking mechanism. The special equipment erecting control system comprises a touch panel module, a control computer module, a sensor module, a driver module and an execution module, the touch panel module is connected with the control computer module, the control computer module is respectively connected with the sensor module and the driver module, the driver module is connected with the execution module, and the execution module is connected with the sensor module. The computer module is controlled to obtain instructions of the touch panel module, single-step control operation, automatic control operation and emergency stop operation of unlocking, erecting, overturning and locking are achieved, and the device has the advantages of being flexible in control, stable in operation, high in reliability, easy to maintain and the like.
Owner:GUIZHOU AEROSPACE TIANMA ELECTRICAL TECH

Data processing method applied to strength detection of cast-in-place concrete foundation pile

A data processing method applied to strength detection of cast-in-place concrete foundation piles relates to the technical field of concrete detection and comprises the following steps: acquiring pile body internal structure data, pile body concrete strength and environmental factors of each cast-in-place concrete foundation pile; deeply drawing a characteristic spectrum; according to the pile body concrete strength and the environmental factors, threshold value intervals corresponding to the key features are obtained, threshold value real-time monitoring is conducted on the feature maps of all the concrete pouring foundation piles, and all the concrete pouring foundation piles are divided into defective concrete pouring foundation piles or qualified concrete pouring foundation piles; data processing is conducted on key characteristics, pile body concrete strength and environmental factors in a historical collection period of each concrete pouring foundation pile, a foundation pile intelligent estimation model is constructed based on a data processing result, qualified concrete pouring foundation piles are estimated, and the efficiency and precision of detection work of the concrete pouring foundation piles are remarkably improved.
Owner:GUANGDONG ZHONGTAI TESTING CO LTD

Drilling and grouting hole sealing sleeve device

The utility model belongs to the field of grouting hole sealing, particularly relates to a drilling and grouting hole sealing sleeve device, and aims to solve the problems that the existing device cannot realize quick disassembly and assembly connection between the device and a grouting pipe, the working efficiency is reduced, and the manpower and material resource cost is increased, and the following scheme is provided: the drilling and grouting hole sealing sleeve device comprises a sleeve main body, the top end of the sleeve main body is detachably communicated with a three-way pipe, the top end of the three-way pipe is fixedly communicated with a pressure gauge, a slurry outlet is formed in the bottom end of the sleeve main body, and a limiting ring is fixedly arranged at the position, above the slurry outlet, of the outer portion of the sleeve main body; and the connecting assembly is arranged on the three-way pipe and used for connecting the device with a grouting pipe. Due to the arrangement of the connecting assembly, quick disassembly and assembly connection between the device and the grouting pipe is achieved, time needed for connecting the grouting pipe is shortened, working efficiency is improved, and therefore manpower and material resource cost is reduced.
Owner:GUIZHOU DEANTAI TECH CO LTD

A soft soil layer small clear distance shield end reinforcement system and its design method

ActiveCN113790058BReduce structural clearanceSave land areaHydro energy generationTunnelsStructural engineeringShield tunneling
The invention relates to a small-clearance shield end reinforcement system for soft soil strata and a design method thereof, comprising an end reinforcement zone and an extended reinforcement zone, wherein the end reinforcement zone is arranged within a certain range outside an end well, an end reinforcement body is inserted into the end reinforcement zone, and the end reinforcement body is arranged between two shield tunnels; the extended reinforcement zone is arranged outside the end reinforcement zone, an extended reinforcement body is arranged in the extended reinforcement zone, the extended reinforcement body is arranged between the two shield tunnels, and part of the extended reinforcement body enters the range of the end reinforcement zone as a transition section. The advantages of the invention are: reducing the structural clear distance of parallel constructed shield tunnels at the end well position; compressing the line spacing under the premise of ensuring the safety of the project, reducing the land area occupied in the urban built-up area during construction, shortening the station length and saving the project construction cost; and minimizing the disturbance of the surrounding strata caused by the parallel shield construction, isolating the strong influence area of ​​the adjacent tunnels.
Owner:CHINA RAILWAY SHANGHAI DESIGN INST GRP CO LTD

Hinge joint rib positioning device

The utility model discloses a hinge joint rib positioning device which comprises a supporting part correspondingly arranged at the installation position of a hinge joint rib on a formwork. And the plurality of positioning pieces are connected with the supporting part and are used for connecting the hinge joint ribs. The hinge joint ribs are fixed in a current binding and supporting mode instead of a traditional binding mode, when concrete is poured and vibrated, the hinge joint ribs can bear large external force, it can be guaranteed that the hinge joint ribs are located at the preset positions all the time through the positioning pieces, and the positions of the hinge joint ribs are unified and orderly.
Owner:临沂市政集团有限公司 +1

Anchoring quality detection method and monitoring system for long anchor cable

The invention relates to the field of monitoring, and discloses a long anchor cable anchoring quality detection method and a monitoring system, an anchoring net degree of a to-be-detected area is obtained, a long anchor cable sequence corresponding to the anchoring net degree is obtained, and a cloud data server generates a detection management container according to a long anchor cable anchoring quality detection task; the long anchor cable anchoring detection device obtains long anchor cable detection index data corresponding to the anchoring net degree according to detection indexes in the long anchor cable anchoring quality detection task; according to a set detection period, the long anchor cable anchoring detection device carries out detection index data collection on the long anchor cable according to the detection indexes to obtain long anchor cable detection index data in the detection period, and if the abnormal long anchor cable does not exist, the detection index variable quantity corresponding to the anchoring net degree is obtained; the attenuation degree consistency of the attenuation degrees of the long anchor cables corresponding to the anchoring net degrees is obtained, and the anchoring quality detection of the long anchor cables is completed. Compared with a traditional manual detection method and a simple physical test method, the method has higher detection accuracy and reliability.
Owner:DEYANG HAOHUA QINGPING PHOSPHATE CO LTD

Soft soil foundation treatment method and device based on municipal road construction

The invention relates to the field of geological engineering, in particular to a soft soil foundation treatment method and device based on municipal road construction. Drawing a geological profile map of the soft soil area, analyzing the soil layer distribution of the soft soil area, and analyzing the soil layer bearing capacity of the soft soil area; constructing a monitoring well pattern of the soft soil area, and calculating the permeability coefficient of the soft soil area; a foundation analysis model of the soft soil area is constructed, and the foundation settlement characteristics of the soft soil area are analyzed through the foundation analysis model; constructing a foundation treatment tuple of the soft soil area, determining scheme parameters of a foundation treatment scheme corresponding to the foundation treatment tuple, analyzing scheme foundation settlement characteristics of the soft soil area by using a foundation analysis model, calculating settlement characteristic loss of the scheme foundation settlement characteristics, and determining a target foundation treatment scheme in the foundation treatment tuple. The stability of the soft soil foundation can be improved, so that the safety of municipal roads is enhanced.
Owner:广东筠诚建筑科技有限公司 +1

Quick closing system for excavation of ultra-deep diaphragm wall I-shaped steel joint and construction method

The invention relates to the field of water stop and seepage prevention of diaphragm wall seams, in particular to an ultra-deep diaphragm wall I-shaped steel joint excavation rapid closing system and a construction method. The I-shaped steel is arranged in the middle of the water stop plate, the I-shaped steel is in a rigid joint form at the joint of the two diaphragm walls, the position of the water stop plate covers the width of the I-shaped steel, holes are drilled in the shear bolt points, the steel bar planting glue is poured after drilling, the shear bolts are installed, and the steel bar planting glue can shorten the strength time of the shear bolts and the water stop plate; the water stop plate is fixed to the inner wall of a wall joint of the underground diaphragm wall through the shear bolts, the flatness of the water stop plate can be adjusted through the shear bolts in the grouting process, it is guaranteed that the flatness of the water stop plate is + / -2 mm, gaps around the water stop plate and the underground diaphragm wall are blocked through the water stop belts which expand when encountering water, and the sealing time is greatly shortened through the quick-setting cement. The anti-seepage device and method are high in speed, good in durability and stable in long-term use effect, and the engineering safety is ensured.
Owner:WUHAN MUNICIPAL CONSTR GROUP