Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

116results about How to "Ensure engineering safety" patented technology

Test bed for testing integrated mechanical properties of anchor rod and test method

The invention relates to the technical field of mine support, and particularly relates to a test bed for testing integrated mechanical properties of an anchor rod and a test method. The test bed comprises a pushing and mixing test mechanism, an installation pretension test mechanism, a bending load test mechanism, an axial load test mechanism, a shearing load test mechanism and an impact load test mechanism, wherein the pushing and mixing test mechanism and the installation pretension test mechanism are arranged on an installation test bed, and the bending load test mechanism, the axial load test mechanism, the shearing load test mechanism and the impact load test mechanism are arranged on a work test bed. By using the test bed, the installing and working process of the anchor rod can be simulated in a laboratory, and one or multiple combined external forces such as torsion, stretching, bending, shearing and impact are applied to the anchor rod; and mutually independent loading systems are adopted to apply corresponding loads to the anchor rod, so as to carry out independent experiments of various loads in the installing and working process of the anchor rod or a combined loading test of a plurality of any working stresses such as stretching, shearing and impact caused by installation stress and surrounding rock deformation, thereby effectively testing the integrated mechanical properties of the anchor rod under the combined action of various different external forces.
Owner:CCTEG COAL MINING RES INST

Gravity pressure water delivery system with automatic-adjusting weir well

The invention relates to a gravity pressure water delivery system with an automatic-adjusting weir well, in particular to a hydraulic adjustment and control system used for water delivery engineering.The system comprises: an adjusting weir well which is arranged between a water inlet and a water outlet and connected through a pipeline. The weir well comprises: a weir well water inlet connected with an upstream pipe at the bottom part of the inlet breast wall of the adjusting weir well, wherein two sides of the inlet breast wall are respectively connected with the side wall of the weir well; the outlet breast wall of the adjusting weir well is connected with the side wall of the weir well and the bottom part of the outlet breast wall is a weir well water outlet connected with a downstreamwater delivery pipe; an overflow weir is arranged at the bottom part of a shaft between the inlet and the outlet breast wall and lies across between two side walls; for longer gravity pressure water delivery engineering, different water delivery flow rates need different water heads; the adjusting weir well can automatically adjust the water heads; when the water delivery flow rate is less than design flow rate, surplus water heads are consumed in sections and the internal water pressure of a pressure pipe culvert is reduced; and at the minimum operating flow rate, the minimum pressure requirement indispensible to the pipe culvert is kept. The water delivery system not only has simple hydraulic control, but also ensures the safe and reliable water delivery of the engineering.
Owner:天津市水务规划勘测设计有限公司

Test bed for installing and pre-tightening of anchor rod and test method

The invention relates to the technical field of mine supporting, in particular to a test bed for installing and pre-tightening of an anchor rod and a test method. The test bed comprises the anchor rod for mine supporting and further comprises a pre-tightening device, a stretching device, a work test bed body, a dynamic torque sensor, a static torque sensor and a load sensor. One end of the anchor rod is anchored into a drill hole model of the work test bed body. The pre-tightening device is used for exerting pre-tightening force to the anchor rod. The stretching device comprises an impact beam and a stretching top beam, and the other end of the anchor rod is fixed to the impact beam. The stretching top beam corresponds to the impact beam and is used for preventing the impact beam from moving in the axial direction of the anchor rod. The installing and pre-tightening process of the anchor rod is simulated in a laboratory through the test bed, transformation of the tightening torque of an anchor rod nut and the axial pre-tightening force of the anchor rod is accurately tested, the torque borne by a rod body is tested after the anchor rod is installed and pre-tightened, and the test bed for installing and pre-tightening of the anchor rod is of great importance in deepening the mechanism study of anchor rod supporting and ensuring engineering safety.
Owner:TIANDI SCI & TECH CO LTD

Construction method for single-piece hoisting of aluminum alloy vault of large vertical storage tank

The invention discloses a construction method for single-piece hoisting of an aluminum alloy vault of a large vertical storage tank. The aluminum alloy vault is fitted to the top of the large vertical storage tank in a covering manner; the aluminum alloy vault comprises a support frame and an outer mask covering the support frame; the support frame comprises a central connector and a plurality of ring beams distributed outside the central connector from inside to outside; the outer mask comprises a middle mask and a plurality of circumferential masks; the outermost one of the circumferential masks is an outer circular mask. The construction method includes: 1, assembling the aluminum alloy vault and a tank bottom; 2, mounting a tank top lift, namely, mounting the lift used for hoisting the required vault, outside the upper portion of the tank which is cylindrical; 3, hoisting the aluminum alloy vault; 4, fixing the aluminum alloy vault; 5, mounting the outer circular mask. The construction method has the advantages that steps are simple, the design is reasonable, construction is easier, construction is efficient, construction effect is good and the aluminum alloy vault can be hoisted to the large vertical storage tank simply and quickly.
Owner:SCEGC EQUIP INSTALLATION GRP COMPANY

Test bed for testing shear load of anchor rod and test method of test bed

InactiveCN104089831ADeepening Mechanism ResearchShear loads are accurate and effectiveMaterial strength using steady shearing forcesDrill holeSystem pressure
The invention relates to the technical field of mine support, and particularly relates to a test bed for testing the shear load of an anchor rod and a test method of the test bed. The test bed comprises an anchor rod for mine support, a working test board, a shearing device, a fixed drilling model, a follow-up drilling model and a hydraulic sensor, wherein the anchor rod is anchored in drilling holes of the fixed drilling model and the follow-up drilling model; the fixed drilling model is mounted on the working test board; the shearing device drives the follow-up drilling model to slide along the radial direction of the anchor rod; a shearing surface against the anchor rod is formed between the fixed drilling model and the follow-up drilling model; the hydraulic sensor is mounted on a loading oil way system of a shearing oil cylinder and used for testing the pressure of the oil cylinder system of the shearing device. Through the test bed, the test of the shearing resistance of the anchor rod in a laboratory is realized, a basis is provided for the theoretical study on the anchor rod support and the anchor rod support design in complicated stress conditions, and thus the test bed has great significance on deepening of the mechanism study on the anchor rod support and guaranteeing of the engineering safety.
Owner:TIANDI SCI & TECH CO LTD

Transportation system and construction method for inclined shaft with small section and long steep slope

The invention discloses a transportation system and a construction method for an inclined shaft with a small section and a long steep slope, and relates to the technical field of underground inclined shaft engineering construction. The transportation system for the inclined shaft with the small section and the long steep slope can ensure the engineering safety, save the construction cost, and is high in construction speed. According to the technical scheme of the transportation system for the inclined shaft with the small section and the long steep slope, a slag-raking machine is placed at the working face in an entrance section of the inclined shaft, a slag unloading platform is arranged at the entrance of the inclined shaft, a fixed pulley and a lifting device are mounted on one side, opposite to the inclined shaft, of the slag unloading platform, and a steel wire rope of the lifting device penetrates through the fixed pulley, and is connected with a mine truck in the entrance section of the inclined shaft; and a slag-raking machine is placed at the working face in an exit section of the inclined shaft, the tail part of the slag-raking machine is provided with a winding engine, and a steel wire rope of the winding engine is connected with a slag carrying truck. According to the construction method for the inclined shaft with the small section and the long steep slope, the inclined shaft adopts blasting construction in the whole sections, excavation construction is conducted on the entrance and the exit of the inclined shaft synchronously, so that the engineering safety is ensured, the construction cost is saved, and the construction period is shortened at the same time.
Owner:SINOHYDRO FOUND ENG

Continuous beam bridge pier temporary consolidation structure and construction method

The invention discloses a continuous beam bridge pier temporary consolidation structure and a construction method, The structure belongs to the field of bridge construction, and comprises a pier, a No. 0 block and a spherical bearing, and also adopts a temporary bearing composed of a cushion block and a tetrafluoro plate. The advantages of the utility model are as follows: 1, the tetrafluoro plateand the concrete cushion block are rigidly and flexibly combined, the settlement is moderate, the alignment of the continuous beam is favorable for controlling the cantilever construction, and the elevation error precision is controllable; 2, that temporary support is simple in structure and low in cost, and the concrete cushion block is convenient and fast to be cut by a mechanical rope, therebysave manpower and material resources; 3, quantitative design, reasonable stress, the secondary internal force greatly reduced, enhance the durability of the bridge. Therefore, by designing the temporary consolidation structure of the continuous beam bridge pier and combining with the corresponding construction method, the structure has the advantages of simple structure, rigid-flexible combination, moderate settlement, convenient use, reasonable stress, enhanced durability of the engineering structure, energy saving and emission reduction, and can ensure the quality and safety of the project,and the economic and social benefits are significant.
Owner:NINGBO COMM ENG CONSTR GRP

Construction method of cover-excavation top-down permanent steel pipe column

The invention relates to a construction method of a cover-excavation top-down permanent steel pipe column, which comprises the following steps: S1, centering a pile position, mounting a steel sleeve and forming a hole by a drilling machine: pressing the steel sleeve into the pile position in a rotating manner by adopting a full-sleeve full-slewing drilling machine, and performing drilling operation at the same time to enable the steel sleeve to advance the drilling depth and detect the perpendicularity of the steel sleeve and the hole-forming perpendicularity; S2, installing a reinforcement cage, and pouring pile foundation concrete; S3, mounting a steel pipe column and checking the perpendicularity of the steel pipe column: mounting a perpendicularity sensor on the steel pipe column, putting the steel pipe column into a full-casing full-slewing drilling machine for hoisting, mounting a plurality of hydraulic jacks on the outer wall of the steel pipe column, and controlling the hydraulic jacks to adjust the position of the steel pipe column according to readings of the perpendicularity sensor. According to the construction method of the cover-excavation top-down permanent steel pipe column, the perpendicularity of the formed hole and the perpendicularity of the steel pipe column can be monitored, deviation rectification is conducted in time, then the installation precision andperpendicularity of the steel pipe column are guaranteed, and the engineering quality and safety performance of a cover-excavation top-down structure are guaranteed.
Owner:THE 4TH ENG OF CHINA RAILWAY 5TH ENG GROUP +1

Anchor rod ultimate anti-pull force design parameter optimization design method under different expansion agent contents in rock and soil masses

The invention relates to an anchor rod ultimate anti-pull force design parameter optimization design method under different expansion agent contents in rock and soil masses. According to acquisitionsof field experiments, the anchor rod ultimate anti-pull force of a rock mass reaches 147 percent of the anti-pull force of ordinary cement or above; the anchor rod ultimate anti-pull force of a soil mass reaches 179 percent of the anti-pull force of ordinary cement or above; and known that compared with the traditional anchoring technology, for a expansion cement slurry anchoring technology, the anchor rod anti-pull force is greatly improved. The expansion cement mortar anchoring technological design parameter optimization design method performs calculation and analysis from three aspects of soil layer and anchoring force, steel bar strength and M30 mortar and correspondingly reduces the drilling diameter, the steel bar cross section and the drilling depth under the condition of ensuring invariable anchorage body ultimate anti-pull force. In the premise of ensuring the engineering safety, anchor rod design parameters are optimized, and the method can remarkably lower the engineering cost and has wide engineering application prospect and popularization value.
Owner:CHINA THREE GORGES UNIV

Loess high-fill furrow foundation drainage structure and laying method thereof

The invention discloses a loess high-fill furrow foundation drainage structure and a laying method thereof. The drainage structure comprises a main blind ditch laid on an original loess foundation inthe extending direction of a main ditch in an original valley terrain, and a secondary blind ditch laid on the original loess foundation in the extending direction of a branch ditch in the original valley terrain and communicating with the main blind ditch. The elevation of a base surface at a communication position of the secondary blind ditch and the main blind ditch is equal to that of the basesurface of the main blind ditch at the position; and the cross section of the secondary blind ditch and the cross section of the main blind ditch are full-gravel cross sections. The laying method comprises the following steps: 1, cleaning surface soil of the original loess foundation and carrying out topographic survey; 2, constructing the main blind ditch; 3, constructing the secondary blind ditch; 4, communicating the secondary blind ditch with the main blind ditch; 5, investigating whether a steep rock slope exists in the construction area or not; and 6, constructing a vertical drainage blind ditch. The loess high-fill furrow foundation drainage structure is stable in structure, large in porosity, smooth in drainage, high in anti-clogging performance and capable of effectively solvingthe drainage problem of an existing loess high-fill project original valley foundation.
Owner:中国机械设备工程股份有限公司 +1

Configuration design method for anti-explosion container made of hybrid fiber composite material

The invention discloses a configuration design method for an anti-explosion container made of a hybrid fiber composite material, and a configuration evaluation criteria. A created energy absorptivity criteria provides a judgment method for optimizing of the anti-explosion container made of the hybrid fiber composite material, and provides an optimal configuration of the anti-explosion container. The configuration design method is characterized by comprising the following steps: constructing an initial anti-explosion container configuration meeting preset conditions; parameterizing an anti-explosion container geometrical configuration; optimizing the initial anti-explosion container configuration according to a multi-island genetic algorithm to obtain a locally optimal solution area of the initial anti-explosion container configuration; carrying out globally optimal solution of the initial anti-explosion container configuration according to a gradient algorithm; evaluating an optimal anti-explosion container configuration according to energy absorptivity. The configuration design method has the advantages that the initial configuration of the anti-explosion container is optimized, so as to provide the optimal configuration; the defects that the conventional metal anti-explosion container is heavy and poor in energy absorptivity are overcome, and the configuration of the anti-explosion container is improved by changing the thickness of a paved layer, so that the energy absorptivity of the anti-explosion container is greatly improved, and engineering safety is guaranteed.
Owner:DALIAN UNIV OF TECH

High-low crane automatic electrical control system and control method

The invention provides a high-low crane automatic electrical control system and control method, and belongs to the technical field of electrical control. The high-low crane automatic electrical control system comprises a controller unit, a display unit, a sensor unit, a wireless transmission unit and a safety protection unit. The controller unit obtains the attitude of a box girder in hoisting according to an inclination angle sensor in the sensor unit, obtains the RTK space coordinate position of the head end and the tail end of the box girder according to a winch height encoder and a crown block stroke encoder, checks and resets the RTK position of a crown block in operation through an RFID position reader, calculates the RTK space coordinate position of the box girder and compares the RTK space coordinate position with a target value, the box girder is controlled to be lifted according to the difference value, automatic box girder lifting is achieved, the control precision is higher, the labor cost is reduced, and meanwhile the construction efficiency is improved; and the safety protection unit is used for guaranteeing that a certain safety distance is kept between the beam endand other objects, collision and scratching are prevented, the controller unit can control equipment to stop in time when an alarm is given, and construction safety is guaranteed.
Owner:THE THIRD CONSTR OF CHINA CONSTR EIGHTH ENG BUREAU +1

Construction method for steel guide wall foundation of sea area deep-water anchor foundation

ActiveCN111206577AAddresses the shortcoming of flat riverbeds that are only suitable for shallow water areasEnsure engineering safetyBulkheads/pilesSoil preservationArchitectural engineeringCofferdam
The invention discloses a construction method for a steel guide wall foundation of a sew area deep-water anchor foundation, and the construction method is applied to suspension bridge anchor foundation construction of sea area deep-water. The construction method comprises a foundation treatment step, an auxiliary steel platform set-up step, a steel guide wall construction step, an even wall slot section division step, an II-stage slot sand backfilling step, an I-stage slot construction step, and an II-stage slot construction step. According to the construction method disclosed by the invention, foundation treatment is performed at an early stage to improve geological conditions, the auxiliary steel platform is set up to create land-area working conditions, steel tube piles are positioned,inserted and punched to inner and outer sides of the axis of an even wall, and construction on the even wall is performed, so that the effects of supporting, retaining water and retaining waves are realized for later-stage foundation pit excavation. The construction method solves the technical problems such as construction hole collapse, a relatively long construction period and disassembly afterconstruction as sea suspension bridge deep-water anchor construction in the prior art needs cofferdams for building an island, reduces construction risk, shortens the construction period, and providesa novel technical method for constructing and applying a cross-sea channel kilometric suspension bridge.
Owner:GUANGDONG PROVINCIAL CHANGDA HIGHWAY ENG

Novel large deformation anchor cable component

The invention provides a novel large deformation anchor cable component. The novel large deformation anchor cable component comprises an outer sleeve; the outer sleeve is provided with a fastener; thefastener is pressed against an inner sleeve in the outer sleeve; the inner wall of the inner sleeve is sloped; the inner sleeve is internally provided with a sliding body attached to the inner wall;and the sliding body is connected with a steel strand. A prestressed anchor cable with large deformation, adjustable tension and an energy absorption function is provided by the invention, can not only strengthen rock and soil mass, but also monitor deformation force and the deformation process in the rock and soil mass by being matched with corresponding mechanical sensors and displacement sensors, and then scientific data of the two aspects are fitted, and have great significance for deformation mechanism and laws of mass and soil mass research. In addition, the tensile resistance of the anchor cable can be manually adjusted according to different engineering conditions and time effects, so that a high tensile state is maintained while the tension resistance is lower than the maximum breaking force of the anchor cable, and thus the great significances of ensuring engineering safety and using the anchor cable in an optimized mode are achieved.
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD

Dynamic compactor for subgrade

The invention relates to a dynamic compactor for a subgrade. The dynamic compactor for the subgrade solves the technical problems of poor subgrade stabilizing effect, time consuming, labor consuming and low efficiency of a road roller in the prior art. The technical scheme is that dynamic compactor structurally comprises a vibratory hammer mechanism with a vibratory hammer, a driving motor and a vibration exciter, an acting bottom plate with evenly distributed ribs on the bottom surface is additionally arranged at the bottom end of the vibratory hammer and the ribs comprise two types, i.e. side pressing cutting-off plates and even pressing ribs, wherein the side pressing cutting-off plates are arranged on the edge of the bottom surface of the acting bottom plate and are respectively provided with an acting surface which is an inwards concave arc surface, the even pressing ribs are evenly distributed at the middle part of the bottom surface of the acting bottom plate and are respectively provided with an acting surface which is outwards convex arc surface, and the side pressing cutting-off plates can cut off external side pressure produced by the vibratory hammer to a soil body. The acting force of the vibratory hammer mechanism can be evenly dispersed through the even pressing ribs in the middle of the bottom of the acting bottom plate, the side pressure of the vibratory hammer mechanism to the soil body can be cut off through the side pressing cutting-off plates on the edge, and the situation that a bridge body is damaged because the side pressure to the edge of a bridge is too large can be avoided.
Owner:李祥莹

Traffic load damping structure and construction method

PendingCN109098058ASet up a reasonable sizeHigh quality assurance rateRoadwaysBridge erection/assemblySocial benefitsQuality assurance
The invention discloses a traffic load damping structure and a construction method, in accordance with that present invention, A macadam partition wall is arrange between that outer side of the edge of the roadbed and the pavement and a plurality of pile foundation, The gravel partition wall extends along the longitudinal direction of several piles, thus effectively reducing the disturbance of traffic load vibration wave to the newly-poured concrete of pile foundation. The vibration-absorbing structure also has the following characteristics: first, it has strong pertinence and is especially suitable for the newly-poured concrete construction of bridges in highway reconstruction and expansion; Second, the design of damping structure is quantitative, the scale of gravel partition is reasonable, and the efficiency is improved. Third, adding anti-disturbance admixture to pile foundation concrete to further improve the quality assurance rate of pile foundation concrete. Therefore, by designing this kind of traffic load damping structure and combining with the corresponding construction method, it has the advantages of simple structure, convenient use, reasonable structure, energy savingand emission reduction, enhancing the durability of the engineering structure, etc., and can ensure the quality and safety of the engineering, and the economic and social benefits are remarkable.
Owner:NINGBO COMM ENG CONSTR GRP

Water stop clamping tool, tunnel longitudinal water stop structure and construction method

The invention relates to the technical field of tunnel construction, in particular to a water stop clamping tool, a tunnel longitudinal water stop structure and a construction method. The water stop clamping tool comprisesa fixing part for mounting on a tunnel side wall template, and a connecting part connected with the fixing part and extending to be above a concrete pouring area; the connectingpart is provided with a mounting structure for connecting with a metal-plate-shaped water stop, and the relative position between the water stop and the connecting part can be adjusted, so that the water stop corresponds to a construction joint after the water stop is connected with the connecting part. The water stop clamping tool is arranged on an inverted arch trestle template, water stop partsare fixed by the connecting part, and the effective adjustment is carried out through the connecting part, thereby solving the problem of difficulty in positioning; and the water stop parts are changed to solve the problems of severe distortion and inconvenience in splicing of the existing water stop parts and achieve the purposes of accurate positioning, straightness and no distortion, and convenient connection of the water stop parts, and the construction quality and the construction safety of the tunnel waterproof construction are ensured.
Owner:CHINA RAILWAY ERJU 5TH ENG +1

Filling and rolling pass quick detection method based on image processing

The invention relates to a filling and rolling pass quick detection method based on image processing. The filling and rolling pass quick detection method based on image processing is characterized byrealizing quick detection of rolling pass by means of the image processing mode, specifically including the steps: according to the characteristics of the rolling track in construction, maintaining the real rolling track width information, according to the scaling, drawing strips with transparency and performing overlaying, converting the image into a grey-scale map, and according to the grey value of each pixel point in the grey-scale map, obtaining the rolling pass at the point. The filling and rolling pass quick detection method based on image processing can quickly and accurately obtain the high precision rolling pass map of a rolling construction area, and can visually reflect the real-time quality information during the rolling mechanical construction process so as to enable the superviser side, the employer side and the construction side to know about the real-time quality information timely to master the construction quality in real time and guarantee engineering safety. Besides, the filling and rolling pass quick detection method based on image processing can realize process control and fact basis supply, and can overcome post-action control and passive management of a traditional quality supervising mode.
Owner:WUHAN UNIV

Transition piece for surface casing feeding based on non-drilling machine time well cementation and feeding method

ActiveCN111706269AReduce the difficulty of making and unloadingOvercoming demandsDrilling rodsDrilling casingsCouplingWell cementing
The invention discloses a transition piece for surface casing feeding based on non-drilling machine time well cementation and a feeding method. The transition piece comprises a drill rod connecting part and a casing connecting part which are distributed up and down, wherein the casing connecting part is sequentially provided with an external thread section I, a convex ring and an external thread section II from top to bottom, and the external thread section II is matched with a connected casing female buckle; the transition piece further comprises a sleeve arranged outside the casing connecting part in a sleeving mode, the inner wall of the sleeve is provided with an internal thread section matched with the external thread section I, and the bottom of the sleeve is provided with a plurality of annularly distributed bearing assemblies; and when the top surface of a connected casing coupling makes contact with the bottom surface of the convex ring, the external thread section II is in threaded connection with the connected casing female buckle, and the bearing assemblies support the bottom surface of the connected casing coupling. The transition piece is used for solving the problemsthat in the prior art, the requirement for driller experience is high, and the transition piece is difficult to release after a casing is fed in place, and the purposes of facilitating connection andrelease between the transition piece and the casing, reducing the operation difficulty and improving the operation efficiency are achieved.
Owner:四川盐业地质钻井大队

Clamping seat enclasping tile type lightning protection net and construction method thereof

InactiveCN104652719AAvoid rain leakageAdvanced connection technologyRoof coveringRubber ringEngineering
The invention relates to a building component, in particular to a clamping seat enclasping tile type lightning protection net for building construction. The clamping seat enclasping tile type lightning protection net comprises galvanized round steels, galvanized flat steels, galvanized screws, sealing rubber rings, galvanized gaskets, a lightning wire, buckling tiles and roof tiles; the middle positions on the galvanized flat steels are connected with the galvanized round steels; the upper ends of the galvanized round steels are connected with the lightning wire; saw kerfs are formed at the positions where the roof tiles are joined with the buckling tiles; screw holes are formed at both ends of the galvanized flat steels; holes are reserved at both tail ends of the buckling tiles; the sealing rubber rings are arranged between the galvanized flat steels and the buckling tiles; the galvanized gaskets are arranged between the galvanized screws and the galvanized flat steels; the galvanized flat steels are connected with the buckling tiles by the galvanized screws; the tail ends of the galvanized screws are embedded into the saw kerfs of the roof tiles; the galvanized screws are tightly connected with each contact point. The connecting mode of the clamping seat enclasping tile type lightning protection net adopts the advanced technology; the clamping seat enclasping tile type lightning protection net is simple and convenient to operate and is convenient to install, move and repair; the clamping seat enclasping tile type lightning protection net avoids the problem that when holes are formed in the tops of the buckling tiles for installation, not only is labor wasted, but also quality defects of roof rain leakage and the like are easy to cause.
Owner:ZHONGTAI CONSTR GROUP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products