[0018] The present invention will be further described below in conjunction with accompanying drawing.
[0019] see figure 1 , carefully investigate the stacking space and terrain conditions of the original tailings on site, select an appropriate position away from the original dam 1, and build the dam-in-dam 3 on the tailings body 2, preferably, the dam-in-dam 3 is selected to be 150 meters away from the original dam 1 ~300 meters. At least one set of rapid dewatering and consolidation system is arranged inside the tailings body 2 below the dam in the dam 3 and the dam in the dam 3, and the rapid dehydration and consolidation system dewaters the inside of the dam in the dam 3 and the tailings body 2 below the dam in the dam 3 The tailings water collected flows out of the original dam 1 and is drained away.
[0020] Further, the tailings water is collected into the rapid dehydration consolidation system, flows out of the original dam 1, and is pumped away or recycled for pro...