Prefabricated concrete components, assembled concrete components and methods of pier head lock anchor grouting straight sleeve connection
A technology of prefabricated concrete and prefabricated components, which is applied in the direction of building components, structural elements, building reinforcements, etc., can solve the problems of loss of life and property, low reliability, no experience, etc., to save lives and property losses, reduce use Effect of steel amount and grouting amount, material saving and cost saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] This embodiment takes the prefabricated concrete components used for vertical connection to form an assembled prefabricated shear wall as an example to describe in detail.
[0038] Such as Figure 1 to Figure 13 As shown, the assembled concrete shear wall connected by the straight sleeve of the pier head lock anchor grouting is composed of the precast concrete shear wall connected by the pier head lock anchor grouting straight sleeve in the cast-in-place zone; the prefabricated components described here For the upper wall and the lower wall.
[0039]The assembled concrete member connected by the straight sleeve of the pier head locking anchor grouting includes the vertical reinforcement 4 of the upper wall, the vertical reinforcement 13 of the lower wall, the vertical reinforcement 4 of the upper wall and the vertical reinforcement 13 of the lower wall through the sleeve The tubes 7 are connected to each other; the upper end of the sleeve 7 is provided with an internal...
Embodiment 2
[0052] Such as Figure 14-15 As shown, in this embodiment, the prefabricated concrete beams and assembled concrete beams connected with the straight sleeve of the pier head lock anchor grouting and the practice are similar to those in Embodiment 1, and can be referred to Figure 1-9 . The prefabricated components are prefabricated concrete beams: a prefabricated beam 18 on one side and a prefabricated beam 19 on the other side, and the prefabricated beam 18 on one side and the prefabricated beam 19 on the other side are connected by a sleeve 7 . The difference is that there is no need to set construction holes in the prefabricated beam 18 on one side and the prefabricated beam 19 on the other side, and the concrete is poured directly between the prefabricated beam 18 on one side and the prefabricated beam 19 on the other side to form a cast-in-place belt; One side also has a plugging pad; a grouting hole and a grouting outlet will be set on the horizontally placed sleeve 7 to...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com