A method for installation and construction of various pipelines in a continuous girder bridge
A pipeline installation and construction method technology, applied to bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as construction difficulties and unreasonable economics, and achieve the effects of saving construction period, economical rationality, and improving labor production efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] (1) Prefabricate and process a plurality of steel platforms 4, the steel platforms 4 are open box bodies, each side of the box body is composed of a plurality of channel steels fixedly connected at intervals, and a plurality of steel platforms A steel platform 4 in the platform 4 is equipped with a first guide pulley whose axis is arranged along the horizontal direction; On the working surface 5; (3) Utilize the automobile crane 7 to pass the steel wire traction rope 2 from the box girder rear casting belt 1 and lower it, and lift the first steel platform 4 to the design elevation by the hook of the steel wire traction rope 2, And be connected with the pre-embedded steel plate on the continuous box girder 3; (4) repeat the described step (3), install the second steel platform 4 along the longitudinal direction of the bridge and connect the second steel platform with the first steel platform Platform welding is connected; (5) repeat described step (4) until finishing the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 