Unlock instant, AI-driven research and patent intelligence for your innovation.

Public building central air-conditioning preopen time calculating method

A calculation method and technology of central air conditioning, applied in the directions of calculation, space heating and ventilation, and application, can solve the problems of small cooling and heating energy loss in public buildings, large cooling and heating energy loss in public buildings, and increasing the operating cost of air conditioners. The effect of reducing operating costs

Active Publication Date: 2015-03-25
上海尤比酷电气有限公司
View PDF6 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

A long pre-opening time can make full use of the valley period of the power grid with a high proportion of green energy, but the loss of cooling and heating energy in public buildings is large, which is not conducive to energy saving; the pre-opening time is short, the loss of cooling and heating energy in public buildings is small, and the ambient temperature of the air conditioner may not reach According to the management regulations, the office comfort is reduced, and it is not conducive to the use of green energy during the valley period of the power grid, and it will also increase the operating cost of the air conditioner
However, how to determine the pre-opening time of the air conditioner, there is no effective method at present

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Public building central air-conditioning preopen time calculating method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047]The embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings, but the present embodiments are not intended to limit the present invention, and any similar structures and similar changes of the present invention should be included in the protection scope of the present invention.

[0048] like figure 1 As shown, a method for calculating the pre-opening time of the central air conditioner in a public building provided by the embodiment of the present invention is characterized in that the specific steps are as follows:

[0049] 1) Obtain the air-conditioning electricity consumption curve and air-conditioning temperature curve of the office building in the historical day of the previous year. The abscissa axis of the air-conditioning electricity consumption curve is the time value coordinate axis, the The coordinate axis is the time value axis, and the ordinate axis is the temperature value axis;

[0050] ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a public building central air-conditioning preopen time calculating method, and relates to the technical field of energy conservation. The method aims to solve the technical problem of reducing the air conditioning operation cost. According to the method, firstly, the air conditioning temperature curve of an office building in the historical days of the previous year is obtained; secondly, a curved section A is intercepted from the air conditioning temperature curve in the historical days of the previous year; thirdly, the air conditioning energy loss rate per unit time is calculated according to the curved section A; fourthly, a curved section B is intercepted from the air conditioning temperature curve in the historical days of the previous year; fifthly, the air conditioning starting power average value and the air conditioning starting time length are calculated according to the curved section B; sixthly, an air conditioning cost target function is set, the minimum value of the air conditioning cost target function is calculated through an iteration method, and thus the air conditioning preopen time length is worked out. By means of the method, green energy can be fully utilized.

Description

technical field [0001] The invention relates to energy-saving technology, in particular to a method for calculating the pre-opening time of central air conditioners in public buildings. Background technique [0002] In order to make full use of green energy such as wind energy and solar energy, and use less non-renewable energy such as thermal power as much as possible, the power system divides the daily power supply into three periods according to the power consumption status, which are grid peak periods, grid normal periods, and grid valley periods. During the peak hours of the power grid when the power supply demand is relatively high (such as 9:00 to 17:00), the proportion of green energy is relatively low. , and the proportion of green energy reaches the highest during the grid valley period when the demand for power supply is the lowest. In order to encourage enterprises to use green energy, the electricity prices are different in different power supply periods. As on...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F24F11/00G06F19/00
CPCF24F11/30F24F11/46F24F11/62G16Z99/00
Inventor 李昌张溯宁
Owner 上海尤比酷电气有限公司