76 results about "Normal periods" patented technology

Train operation control system based on space-air-vehicle-ground integration network

ActiveCN106218673AMeet the needs of high capacityLow costAutomatic systemsControl systemEngineering
The invention discloses a train operation control system based on a space-air-vehicle-ground integration network. The train operation control system comprises an aircraft, a satellite, a wireless communication base station, vehicle-mounted equipment, trackside equipment and a dispatching center, wherein the aircraft is used for achieving train speed measurement, train location, line or turnout condition monitoring and a communication function; the satellite is used for achieving train speed measurement, train location and a communication function; the wireless communication base station is used for achieving a communication function; the vehicle-mounted equipment is used for achieving train speed measurement and train location, train control and a communication function; the trackside equipment is used for achieving train speed measurement, train location, line or turnout condition monitoring and turnout control; the dispatching center is used for achieving line or turnout resource dispatch and trackside equipment control. By means of the space-air-vehicle-ground integration network, dynamic adjustment of transport capacity of low-transport-capacity rails is achieved, and the requirement for high transport capacity in a special period is met. In addition, the train operation control system can operate according to an ordinary train operation control system in a normal period, the cost is reduced, and the train safety is guaranteed through redundancy design.
Owner:TRAFFIC CONTROL TECH CO LTD

Fixed-time charging method and fixed-time charging device for electric automobile charging pile for peak regulation of power distribution network

The application discloses a fixed-time charging method and a fixed-time charging device for an electric automobile charging pile for peak regulation of a power distribution network. The fixed-time charging method and the fixed-time charging device are suitable for application scenes such as a charging pile at the parking side of a user, which can be occupied for a long time and has low charging current. By using the method and the device, the charging pile preferably selects a low-valley period for charging, and then normal period and final peak period according to load characteristics of a power distribution network line; an optimal fixed-time charging scheme which is most beneficial to peak regulation of the power distribution network is automatically generated, so that fixed-time charging of a to-be-charged electric automobile is realized by the power distribution network with a relatively-small electrical load, and on-site peak regulation is realized. Therefore, according to the method and the device, on the premise of meeting charging demands of the user and peak regulation demands of the power distribution network, the charging pile can select the period with lower use expenses for automatic fixed-time charging; optimal charging time is used as the reference of peak regulation of the power distribution network, and real-time communication between the peak regulation and scheduling is not needed; in addition, real-time adjustment of the load of the power distribution network line is not needed, so that a peak regulation realizing mode is simpler and more convenient.
Owner:YUNNAN POWER GRID

On-line closed loop optimally-adjusting-and-controlling method for mine ventilation system

ActiveCN104832203AAvoid precisionLow power consumption air supplyTunnel/mines ventillationControl systemClosed loop
The invention provides an on-line closed loop optimally-adjusting-and-controlling method for a mine ventilation system. A constructed mine ventilation on-line closed loop optimally-adjusting-and-controlling system comprises a mine ventilation monitoring platform, air needing air flue state collecting subsystems distributed to air needing air flues, draught fan working condition collecting subsystems distributed to the air needing air flues and adjusting and controlling subsystems distributed to adjusting air flues and used for adjusting the wind resistance change amount of a wind resistance adjusting device. According to the on-line closed loop optimally-adjusting-and-controlling method, as the actual measurement air supply amount of wind needing points and draught fan actual working conditions are directly used for calculating target function values, and the actual adjusting amount of the wind resistance adjusting device serves as a control strategy, the problems of inaccuracy, agnosticism and the like of parameters of the ventilation system can be effectively solved, a large number of state identification sensors of the ventilation system can be saved, and more importantly, the adjusting effect can be directly obtained. On-time as-required low-power-dissipation air supply of the mine ventilation system is fundamentally guaranteed, and airflow control over the mine ventilation system in the normal period and the catastrophe period can be effectively achieved through the method.
Owner:山东蓝光软件有限公司

Vehicle shunting traffic lights and uses thereof

InactiveCN101231788BAppropriate amount of shuntSafe and smooth traffic effectRoad vehicles traffic controlRemote controlEngineering
The invention discloses a vehicle diverging traffic light and application thereof. The invention belongs to the traffic control field. According to the technical proposal of the invention, a first basic structure of the traffic light consists of a strip-shaped light, an arrowhead light and a dish-shaped light, wherein, four light bodies are manufactured to constitute a main light body for turningaround, turning left, driving straight ahead and turning right. A second basic structure is that the arrowhead light is manufactured into two light bodies for turning left and driving straight ahead.A third basic structure consists of a human-shaped light, a vehicle-shaped light, a left light and a right light, wherein, a walking and pushing vehicle and two front light bodies constitute an auxiliary light body. The lights are controlled by switches and six basic signal sources can be provided, thus forming a whole or separate vehicle diverging traffic light. The application signal of the traffic light can classify, diverge and control vehicles at intersections of urban highway through signals. The vehicles can be forced to diverge at peaks; divergence of vehicles can be controlled in a normal period; the vehicles drive naturally in a depressed period. In addition, the invention provides a novel signal option for intelligent or remote control of divergence and passing of vehicles, thus improving the passing security and capability of road intersections.
Owner:张立胜

Energy control method and control system for optical storage and charging system

The invention relates to an energy control method and a control system of a optical storage and charging system. When a power grid is in a peak period, if the photovoltaic power is greater than the load power, the excess power is used for charging the energy storage unit. If the photovoltaic power is less than the load power, controlling the discharge of the energy storage unit to supplement the required power; If the photovoltaic power is greater than the load power, the excess power is used to charge the energy storage unit when the power grid is in the normal period. If the photovoltaic power is less than the load power, the energy storage unit is controlled not to discharge, and all the power required is provided by the power grid. The energy control method provided by the invention fully utilizes the optical storage coordination control and reasonably cooperates with the commercial power, so that the electric energy in the energy storage unit is used as much as possible during thepeak period, and the electric energy of the power grid is not used; In peacetime, the power in the grid is used as much as possible, and the power in the energy storage unit is not used, so as to achieve the balance of power consumption and maximize the income, and ensure the power supply requirements on the demand side.
Owner:STATE GRID QINGHAI ELECTRIC POWER +4

Spa control with improved heater management system

A spa control system that measures the flow of water through the heater of a spa and accurately reports water temperature in the spa using only one solid-state sensor in the heater. The working condition of the sensor is first determined by energizing the spa heater for a brief period of time, with the circulation pump de-energized, then quickly de-energizing the heater and watching for a heat rise at the sensor. A small rise is sufficient to proceed with the flow test. The flow rate is now determined by energizing the pump, with the heater still de-energized, and observing the rate at which the moving water cools the inside of the heater. If there is no circulation of water through the heater, the temperature of the sensor will continue to rise from the energy applied when the heater was briefly energized. This rise will be quite significant and a clear indication of a flow problem. Conversely, with normal flow, the inside of the heater will be cooled to approximately the same temperature as the spa water in just a few seconds. If the flow is found to be adequate, the heater may be energized for a normal period of time. Since, while cooling, a measured number of degrees is dropped in a measured number of seconds, a flow rate can be reported to the user as an estimate of gallons per minute. The sensor is now carefully monitored for a sudden increase in temperature, which would indicate loss of a normal flow of water. It is known that the temperature of the water in the spa will be within one or two degrees of the observed temperature at the sensor in the heater, even when the heater is energized. The water temperature can, therefore, be accurately reported to the user just from measuring the temperature of the water in the heater. The only problem with making all measurements at the heater is that the real water temperature is unknown when the pump is not running. This problem can result in short heating cycles, or create the need to run the pump several times per day just to check on the real water temperature. The present invention uses artificial intelligence to find the proper time to turn the pump back on at a time when the spa is just beginning to need heat. Any errors in finding this time are added back to subsequent calculations to make future cycles more accurate.
Owner:BALBOA WATER GRP LLC

Flood pre-disaster early warning method based on sequential water scope remote sensing image

InactiveCN106443701AContinuous remote sensing image dataSolve problemsElectromagnetic wave reradiationDisaster monitoringComputer science
The invention discloses a flood pre-disaster early warning method based on a sequential water scope remote sensing image. The method comprises the following steps: 1, inputting a multi-temporal high-resolution ground surface reflectivity remote sensing image and performing data preprocessing; 2, calculating a water body exponent, and based on a water body exponent image, extracting a water body scope binary image; 3, extracting water body features of a to-be-detected period and water body features of a normal period; 4, respectively performing stacked comparison analysis on the water body features of the to-be-detected period and the water body features of the normal period to detect abnormity information; and 5, analyzing the tracked detected abnormity information, and if a place which is originally not supposed to be covered by a water body in an observation area is continuously covered by the water body, indicating that the risk of a flood disaster in the observation area is increased and an alarm should be given. According to the method, abnormities of the water body features are analyzed from multiple angles, an early warning of the risk of the flood disaster in the observation area is given according to abnormity analysis, and thus the problem of difficulty in pre-disaster monitoring early warning of the flood disaster is effectively solved.
Owner:HUAZHONG AGRI UNIV

Body weight health management system and method

InactiveCN110400622AAvoid showing publicNutrition controlData displayData acquisition
The invention discloses a body weight health management system and a method, wherein the system and the method relate to the field of body weight monitoring management. The system comprises a body weight evaluating module and a health management module. The body weight evaluating module comprises a data acquisition module, a data calculating module, a data standard database, a data analysis moduleand a data display module. The health management module comprises a nutrition intake calculating module and a motion heat consumption calculating module. The management method comprises the steps ofinputting basic information to a to-be-tested user, wherein the basic information comprises body weight and body height; calculating the BMI value of the to-be-tested user according to a formula BMI value=(body weight)/(body height)<2>; by means of the calculated BMI value and the basic information of the user, analyzing a fact that the body weight of the user is in a thin period, a normal period,an overweight period or a fat period; and generating an optimal body weight range and a body weight management suggestion. The method performs body weight management on the teenagers in the age period of 7-18, and furthermore can supply an energy consumption value list of different movements and the daily nutrition requirement amount recommended values for aiming at the evaluation result, therebytruly realizing body weight health management.
Owner:北京市海淀区疾病预防控制中心

Semifluid extract of deer foetus and preparation method thereof

The invention discloses the semifluid extract of deer foetus, which takes the deer foetus, deer born after the normal period of gestation and not fed by breast milk, American ginseng, medlar, eucommia bark, white paeony root, spina date seed, villous amomum fruit, safflower, echinacea, astragalus and honey as raw materials. The semifluid extract of deer foetus is prepared by the following steps of: pre-treating the deer foetus and the deer born after the normal period of gestation and not fed by the breast milk, preparing deer foetus powder and the powder of the deer born after the normal period of gestation and not fed by the breast milk from the deer foetus and the deer born after the normal period of gestation and not fed by the breast milk by adopting freeze-drying technology, compounding the deer foetus powder, the powder of the deer and the other components according to proportion, and performing bulking and sterilization to prepare the semifluid extract. The semifluid extract of deer foetus completely maintains the bioactive ingredients of the deer foetus and the deer born after the normal period of gestation and not fed by the breast milk, has the double effects of treatment and nourishing, and is particularly suitable to be taken by weak patients with immune dysfunction, female chronic pelvic inflammatory disease, leucopenia after cancer chemotherapy and radiotherapy, and the like.
Owner:金龙亮
Who we serve
  • R&D Engineer