Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

500 results about "Late period" patented technology

Construction method for rock salt cavity gas storage house

InactiveCN101315025APlay the role of isolating and protecting the top plateRegulate market supplyMining devicesFluid removalOil waterFresh water
The invention relates to a construction method for a gas storage reservoir in a rock salt cavity, belongs to the salt mine mining and the rock salt cavity utilization fields, and mainly used for the dissolution construction of an underground gas storage reservoir in a eutectic salt deposit. The construction method is characterized in that a method for down-flow type gas storage reservoir construction comprises the following steps: fresh water is infused into a salt deposit by a water injection pump and through a water injection pipe, the rock salt is dissolved from up to down, and at the same time, the natural gas is infused; the expenses for oil consumption of the original oil cushion method and the cost for brine purification treatment can be saved by using the method; and the method is more economical and more environment-friendly. The gas storage reservoir can be used from the beginning of construction; the single well oil cushion method with three to five years of construction cycle is not required for constructing the gas storage reservoir; the construction of the gas storage reservoir needs no cycle basically; the reservoir storage capacity is small in the beginning period; the gas storage reservoir can be used as a large gas storage reservoir in the middle and the late periods; the problems of long period for the construction of the gas storage reservoir by using the oil cushion method, difficult detection of the oil water interface, as well as other relative technical problems are thoroughly solved; and the construction method is an ideal method for rapid dissolution construction of the gas storage reservoir in the rock salt deposit.
Owner:TAIYUAN UNIV OF TECH

Apparatus and method for nitrogen removal by combining garbage leachate SBR and anaerobic ammoxidation

The invention relates to an apparatus and a method for nitrogen removal by combining garbage leachate SBR and anaerobic ammoxidation, which belongs to the low carbon nitrogen (CN) ratio high density ammonia nitrogen garbage leachate biological denitrogenation technical field. The apparatus comprises an integrated water tank, a SBR short distance nitrated reactor and an anaerobic ammoxidation reactor; a preposition water tank and a postposition water tank in the integrated water tank are communicated with a peristaltic pump and the SBR short distance nitrated reactor, the postposition water tank is connected with the bottom of the anaerobic ammoxidation reactor through the outlet pipe and the peristaltic pump, an self-circulation pipeline is provided on the anaerobic ammoxidation reactor, and is connected with the SBR preposition water tank through the outlet pipe and the peristaltic pump. The method comprise the following steps starting the SBR short distance nitrated reactor, starting the anaerobic ammoxidation reactor, and an operation is in series of the SBR short distance nitrated reactor and the anaerobic ammoxidation reactor is carried out. The apparatus of the present invention is suitable for organic matter removal and short distance nitrogen removal of the garbage leachate at late period in the garbage landfill, the process is advanced, and the advantages of energy saving and consumption reduction is obvious.
Owner:BEIJING UNIV OF TECH

Distribution network line inspection system based on tablet computer

The invention provides a distribution network line inspection system based on a tablet computer. Each device of a distribution network line is provided with an identification code which is used for storing license plate information of the corresponding device and only identifying the corresponding device, the identification codes are read through a hand-held terminal which is connected with a background distribution network line inspection server through a wireless network, the hand-held terminal takes identified information as a key field for querying a distribution network line database on the distribution network line inspection server to acquire detailed information about the line at a server side, and the hand-held terminal transmits on-site pictures and written records back to the distribution network line inspection server through the wireless network. The distribution network line inspection system has the advantages that for performing inspection operation, the hand-held terminals (the tablet computer, a smartphone and the like) are used for scanning the bar codes to query the database and acquire the relevant information, so that the real-time quick query of the records and the modification and the maintenance of data are realized, and the efficiency of the inspection operation as well as the data entry and maintenance in the late period are improved.
Owner:无锡扬晟科技股份有限公司

Electric-hydraulic dual-control energy storage type fracturing well completion switch and switch control method

The invention discloses an electric-hydraulic dual-control energy storage type fracturing well completion switch. The electric-hydraulic dual-control energy storage type fracturing well completion switch comprises an upper joint, a center pipe, a pressure transmission outer tube, a slide sleeve outer tube, an outer sheath and a lower joint which are sequentially connected from top to bottom, wherein an energy storage device is arranged on the center pipe; a slide sleeve system is arranged inside the slide sleeve outer tube; a hydraulic transmission system is arranged inside the slide sleeve outer tube and the outer sheath; each of the center pipe, the pressure transmission outer tube and the slide sleeve outer tube is provided with communicated pressure transmission holes; and the energy storage device, the slide sleeve system and the hydraulic transmission system are communicated through the pressure transmission holes. A control driving system is also arranged between the lower half part of the slide sleeve outer tube and the outer sheath. The electric-hydraulic dual-control energy storage type fracturing well completion switch solves the problems that during the conventional ball injection slide sleeve staged fracturing, due to the existence of a ball seat, the layering stage number is limited; the oil well yield is influenced; and the late-period control production and the selective production cannot be realized, and the like.
Owner:CHINA PETROLEUM & CHEM CORP +1

Wire rod for prestressed concrete steel stick and manufacturing process

The invention relates to a novel steel wire rod and a manufacturing technique thereof. A prestressed steel bar used as the distributed steel of tubular piles is a new product developed in recent years, and the raw material thereof, namely, the steel wire rod, has no special steel and production technique; the controls for the components and performances, etc. of the steel wire rod are different, which results in larger fluctuation thus bringing the producers and the users more difficulties; therefore, the novel steel wire rod and the manufacturing technique thereof are invented. The components of the novel steel by weight percentage are: 0.28-0.34 percent of C, 0.70-1.10 percent of Si, 1.10-1.50 percent of Mn, less than or equal to 0.025 percent of S, less than or equal to 0.025 percent of P, less than or equal to 0.25 percent of Ni, less than or equal to 0.25 percent of Cr and less than or equal to 0.20 percent of Cu; the adopted technique is converter - ladle furnace (LF) refining - continuous casting - highline mill; in the converter process, high lance height is adjusted, returned slag by the converter is added in the front period, and the alkalinity is controlled in the middle and late period; stirring is done under soft blowing before the end of the process, and then deoxidation by adopting SiAlBa is carried out; in the ladle furnace (LF) refining process, reductive white slag is adopted, the CaSi wires are fed and before finishing the refining, and soft argon blowing is done; in the continuous casting process, the degree of superheat and the casting speed of the molten steel are controlled and casting is preformed under whole course protection; in the rolling process, the delayed cooling technique is adopted. The novel steel wire rod, when in use, the control range of the components is narrow, therefore, the fluctuation of adjacent batches is small; the performance of the novel steel wire rod is stable, and the aberration thereof is small.
Owner:TIANJIN IRON & STEEL GRP

Regulation and control method for rice nitrogen topdressing based on nitrogen spectral index method

The invention belongs to the technical field of crop growing management and discloses a regulation and control method for rice nitrogen topdressing based on a nitrogen spectral index method. According to the invention, the nitrogen spectral index method is constructed according to nitrogen amount required by target rice yield, apparent utilization rate of spike fertilizer, plant real-time nitrogen accumulation amount estimated based on reflectance spectrum and soil nitrogen supplying amount while nitrogen fertilization based on a nutrient balancing principle. According to the invention, in the aspect of real-time information acquisition, plant canopy group information is utilized, thus the regulation and control method disclosed by the invention has the quicker and lossless characteristics and the like, thereby avoiding the phenomenon of point replacing surface; in the aspect of a nitrogen topdressing regulating and controlling model, the soil nitrogen supplying amount and nitrogen fertilizer utilization rate during the middle-late period are quantified, thereby enhancing the mechanism characteristic and accuracy of nitrogen topdressing amount estimation and improving the quantification level.
Owner:神农智慧农业研究院南京有限公司

Method and system for transmitting video data

The invention provides a transmission method and a system for video data. The system comprises a multicast gateway which is connected between a video source and a client end, and the method comprises the following steps: the multicast gateway receives a video source request message from the client end, a video source protocol is adopted to connect with the video source, receives the video data and converts the video data into a protocol data packet of the client end, the data packet is added with serial number, then the data packet is sent to the client end through a multicast address which is corresponding to the video source, and the data packets sent in the late period are stored in a buffer area; and then the client end judges whether packet loss exists after receiving the data packet, if packet loss exists, the client end sends a packet loss feedback message. The multicast gateway searches the data packet corresponding to the serial number in the buffer area, if the search succeeds, then resends the data packet to the client end again. The transmission method of the invention stores the data packets sent lately in the buffer area, and the lost data packet is searched in the buffer area and is sent again when packet loss existing, thus ensuring the reliability of data transmission.
Owner:GUANGDONG VTRON TECH CO LTD

Method as well as device and system for adjusting working voltage of multi-carrier power amplifier

The invention discloses a method for adjusting the working voltage of a multi-carrier power amplifier, which comprises the following steps: counting the telephone traffic within the extent of jurisdiction of the multi-carrier power amplifier in a latest period of time according to a preset time interval; determining the working voltage required by the multi-carrier power amplifier for bearing the telephone traffic according to a preset configuration file, wherein the configuration file comprises a corresponding relation between a telephone traffic value and a working voltage threshold value; and adjusting the currently used working voltage of the multi-carrier power amplifier according the determined working voltage, thus, the working voltage of the multi-carrier power amplifier can be dynamically adjusted according to the change of the telephone traffic so as to ensure that an obvious difference value cannot appear between the currently used working voltage of the multi-carrier power amplifier and output signal peak value voltage so as to greatly reduce the power loss, improve the power efficiency of the multi-carrier power amplifier, further save the electric energy to a large degree and avoid the resource waste. The invention simultaneously discloses an adjustment device, a multi-carrier base station and a communication system.
Owner:CHINA MOBILE COMM GRP CO LTD

Optical fiber loop framework and winding method thereof

The invention provides an optical fiber loop framework comprising a framework body the rim of which is provided with an annular groove. A plurality of optical fiber grooves are arranged at the bottom of the groove of the framework body along an optical fiber winding direction; and the distance of the adjacent optical grooves is consistent with the diameter of an optical fiber to be wound. A plurality of positioning bulges and positioning grooves, which are convex and concave alternatively, are arranged on the lateral wall of the framework body along the optical fiber winding direction; and the diameters of the positioning bulges and the positioning grooves are opposite to positions, having equal distanced with the bottom of the groove, on the two lateral walls of the diameter of the optical fiber to be wound in a convex-concave mode. An optical loop winding method using the framework comprises the following steps of: 1) calculating and preparing the optical fiber with enough length and remaining a tail fiber enough; 2) marking the both end points and central point of the optical fiber, and marking symmetrical central points on the outer wall at the right side of the framework; 3) tightly adhering the optical fiber to the inner side of the right wall of the framework, aligning the left and right symmetrical central points of the optical fiber to the symmetrical central points with the symmetrical central point mark on the outer wall of the framework, and winding the optical fiber by using a four-pole symmetrical winding method until the two sections of optical fibers are wound to the respective final points respectively; 4) fixing the tail fiber on the framework; and 5) carrying out later-period curing process.
Owner:武汉长盈通光电技术股份有限公司

Prefabricated bearing platform suitable for large-diameter tubular column foundation of sea bridge and construction method thereof

The invention relates to a prefabricated bearing platform suitable for a large-diameter tubular column foundation of a sea bridge and a construction method of the prefabricated bearing platform. The prefabricated bearing platform is of a multi-box lattice type concrete structure, and a box chamber and the large-diameter tubular column foundation are uniform in arrangement. Movable steel bottom plates are arranged at positions, corresponding to tubular columns, of bottom plates, and connecting reinforcing steel ribs are arranged on the inner wall of the prefabricated bearing platform. The construction method includes the steps of prefabricating the bearing platform in a dry dock on the bank side, filling the dry dock with water after the bearing platform is prefabricated, enabling the prefabricated platform to float by itself, opening a lock when the water level inside the dock is flush with the water level of the sea surface, and dragging the prefabricated bearing platform to the position of a pier; filling the prefabricated bearing platform with water so that the prefabricated bearing platform can sink onto a temporary support, and erecting an operating platform on the top of the prefabricated bearing platform; taking down the movable steel plates, conducting tubular column sinking construction, pouring underwater bottom sealing concrete, pumping water, bonding the reinforcing steel ribs, pouring bearing platform concrete, and forming a complete bearing platform structure. According to the prefabricated bearing platform and the construction method, platform erecting expenses can be saved, materials are used completely, construction investment and time are saved, and the prefabricating bearing platform can bear force together with later period bearing platform concrete.
Owner:CHINA MAJOR BRIDGE ENERGINEERING

Database table space monitoring method

ActiveCN104636450AAccurate automatic conversionEnable effective evaluationResourcesSpecial data processing applicationsBusiness dataComputer science
The invention discloses a database table space monitoring method. The method comprises the steps that a specific growth period and an alarm threshold valve of minimum available days of database table space are set in advance; the using conditions of a daily table space data volume is acquired regularly; a latest period serves as an acquisition cycle, the daily data growth amount during the acquisition cycle is extracted, and a reference value of the daily growth amount is calculated; the number N1 of the available days of a surplus capacity is calculated according to the surplus size of the current table space and the reference value of the daily growth amount; a judgment is conducted on the number N1 of the available days of the surplus capacity to see if the specific growth period is included, and the available days of the surplus capacity are adjusted; the table space with the available days of the surplus capacity reaching the alarm threshold valve is subjected to early warning. According to the database table space monitoring method, the table space usage rate information can be automatically transformed into the available days accurately by dividing the database table space growth into a normal business data growth period and the specific growth period, so that effective assessments of the daily business data growth amount and the available days of the surplus capacity of all the current table space are achieved.
Owner:SHANGHAI SNC NET INFORMATION TECH CO LTD

Preparation method of disturbed belt sample for reflecting stress state of primary rock

InactiveCN103983490AReflect the basic characteristicsGuaranteed uniformityPreparing sample for investigationPreconsolidation pressureStress relieving
The invention provides a preparation method of a disturbed belt sample for reflecting a stress state of a primary rock and belongs to the technical field of geotechnical engineering. The preparation method comprises the following steps: firstly carrying out field investigation on a disturbed belt test hole to measure the densities and moisture contents of sites at different depths from the hole wall, sampling at the sites at which the parameters tend to be consistent, and simultaneously obtaining the stresses of the primary rocks at the sampling sites by virtue of a stress relieving method; carrying out indoor remodeling sampling including the steps of preparing the sample, controlling a sample preparation process, carrying out later-period standardization process on the sample and carrying out contrastive analysis on the sample and an undisturbed sample by virtue of an electron microscope scanning experiment and a mechanical experiment. The preparation method has the advantages that oversize processing is carried out on a disturbed belt by a substitution method, and simultaneously pre-solidifying pressure and voltage stabilization time are controlled to carry out static load solidifying so as to improve a sample preparation pressure chamber; the structure is simple, the cost is low, the experimental time is saved, natural features of the disturbed belt can be well reflected, the reliability of an experimental result is high, the strength is close to the actual application, and a good effect for preparing a uniform remodeled sample for reflecting the stress state of the primary rock is achieved.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products