adss optical cable air connection method
An optical cable and prefabricated optical cable technology, applied in optical fiber/cable installation, optics, light guide, etc., can solve problems such as difficulty in meeting the intelligent development and requirements of power systems, difficulty in emergency repair, and long repair time, saving materials, The effect of shortening construction time and reducing maintenance costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] Such as Figure 1-Figure 7 As shown, the joint assembly 4 is composed of two ADSS optical cable air splicing splice boxes 5 connected by prefabricated optical cables 6, wherein the two ends of the prefabricated optical cables 6 are respectively connected to the stressed bodies 52 of the ADSS optical cable air splicing splice boxes 5. Prefabricated, the connection method can be made non-detachable, so as to give full play to the tensile performance of the connection part. Before installation, a prefabricated optical cable storage box 7 can be provided between the two ADSS optical cable air splicing joint boxes 5. When installing Disassemble it so that it is separated from the ADSS optical cable air splice box 5 at both ends. Wherein the length of the prefabricated optical cable 6 can be 2-5 meters.
[0038]Further, the ADSS optical cable air splice box 5 includes a box body 51, a force receiving body 52 and an optical fiber connector 55, the box body 51 is a hollow shel...
Embodiment 2
[0049] Such as Figure 6 , Figure 7 In this embodiment, the joint assembly 4 is a single ADSS optical cable aerial splice box 5; the structure of the ADSS optical cable aerial splice box 5 is the same as that of the first embodiment, and is also divided into two types, and the specific structure of the stressed body 52 is selected according to the gear distance .
[0050] The joint assembly 4 in the present embodiment is applicable to the situation that there is surplus cable on one side of the fault point, and its splicing method is:
[0051] First, untie the optical cable on the side of the fault point with the remaining cable from the tower 1. The method is to only untie the U-shaped ring on the tower 1, and the pre-twisted wire 58 on the optical cable does not move, which will be used to fix the connection of the optical cable. Part 3 is removed from the hoop 2 on the pole tower 1, and the faulty optical cables are pulled together until the heads of the faulty points of...