A method and device for obtaining the prestressing force of a tower crane boom
A boom and prestressing technology, applied in cranes, instruments, design optimization/simulation, etc., can solve the problems of increasing the bending moment of the boom, reducing the lifting capacity of the boom, and increasing the self-weight of the boom , to achieve the effect of improving lifting capacity, improving force characteristics, and simple implementation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention will be further described below in conjunction with examples, and the following examples are only used to illustrate the technical solutions of the present invention, but do not limit the present invention.
[0021] attached figure 1 It is a specific embodiment of the present invention to obtain prestressing of the boom, including a support arm (1), a boom (2), a jib pull rod (3), and a tower body (4). For the convenience of explanation, figure 2 for figure 1 Schematic diagram of the simplified mechanical model of , the jib and support arm are fixed at point A, one end of the jib tie rod is hinged at point B of the support arm, and the other end is hinged at point C of the jib, forming a statically indeterminate structural system. Among them, the distance between the lifting point position C of the jib jib pull rod and the fixed point A is , the total length of the boom is , the total length of the support arm is , when the boom is not p...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


