The initial support structure and construction method of the high side wall anchored and pulled in the underground structure of the underground structure in the rock formation
Patent Information
- Authority / Receiving Office
- CN ยท China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHINA RAILWAY LIUYUAN GRP CO LTD
- Publication Date
- 2018-08-28
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of design and construction of tunnels and underground engineering, and in particular relates to a high-side-wall anchor-drawn initial support structure and a construction method of an underground structure excavated in a rock formation. Background technique
[0002] With the development of economic construction and national defense, the development and application of large-space underground structures that can meet different functions are increasing in my country's urban construction, such as subway stations, underground factories and civil air defense projects.
[0003] In the construction of large underground structures in rocky strata, the horizontal lateral pressure is generally limited. In order to facilitate use, save investment and facilitate construction, arched cross-section structures with straight side walls are usually used. Under the condition of good surrounding rock and deep burial, the new Au...