The initial support structure and construction method of the high side wall anchored and pulled in the underground structure of the underground structure in the rock formation

An underground structure and construction method technology, applied in underground chambers, earthwork drilling, wellbore lining, etc., can solve the problem of enlarging arch structures and stratum settlement deformation, unfavorable surrounding rock and rapid closure of structures, affecting construction space and construction progress and other issues, to achieve the effect of reducing the amount of abandoned projects, facilitating construction organization, and saving project cost
CN104863613BActive Publication Date: 2018-08-28CHINA RAILWAY LIUYUAN GRP CO LTD

Patent Information

Authority / Receiving Office
CN ยท China
Patent Type
Patents(China)
Current Assignee / Owner
CHINA RAILWAY LIUYUAN GRP CO LTD
Publication Date
2018-08-28

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention belongs to the technical field of design and construction of tunnel and underground engineering, and particularly relates to a high-side-wall anchored primary support structure for a rock strata underground excavation underground structure, and a construction method of the high-side-wall anchored primary support structure. The high-side-wall anchored primary support structure is characterized in that the surface of a steel pipe pile and an adjacent steel pipe pile are sealed through a spray concrete surface layer; the tops of the steel pipe piles are vertically connected through a top ring beam; a ring beam grouting steel pipe is embedded into the top ring beam; a ring beam prestress anchor cable and a steel pipe pile prestress anchor cable are vertically arranged; one end of the ring beam prestress anchor cable is mounted on the top ring beam and locked by a ring beam fixing part; the steel pipe pile prestress anchor cable is positioned below the ring beam prestress anchor cable; the ring beam prestress anchor cable is fixed to the spray concrete surface layer through a concrete fixing part. The high-side-wall anchored primary support structure is suitable for a straight sidewall primary support structure of a large cross tunnel and an underground structure which are arranged at the weak fractured rock strata.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the technical field of design and construction of tunnels and underground engineering, and in particular relates to a high-side-wall anchor-drawn initial support structure and a construction method of an underground structure excavated in a rock formation. Background technique

[0002] With the development of economic construction and national defense, the development and application of large-space underground structures that can meet different functions are increasing in my country's urban construction, such as subway stations, underground factories and civil air defense projects.

[0003] In the construction of large underground structures in rocky strata, the horizontal lateral pressure is generally limited. In order to facilitate use, save investment and facilitate construction, arched cross-section structures with straight side walls are usually used. Under the condition of good surrounding rock and deep burial, the new Au...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More