Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Power system grid structure reconfiguration and optimization method based on fuzzy chance constraint

A grid reconfiguration and power system technology, applied to electrical components, circuit devices, AC network circuits, etc., can solve the problems of different restoration reliability and uncertainty of restoration reliability

Inactive Publication Date: 2015-08-26
YUNNAN ELECTRIC POWER DISPATCH CONTROL CENT +1
View PDF1 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Similarly, the recovery reliability of the line when it is put into operation is also uncertain. Different line combinations cause the overall recovery reliability of the target grid to be different. Based on the consideration of system security, we often hope that the formed target grid has a high reliability. Reliability, there is little research on this aspect before

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Power system grid structure reconfiguration and optimization method based on fuzzy chance constraint
  • Power system grid structure reconfiguration and optimization method based on fuzzy chance constraint
  • Power system grid structure reconfiguration and optimization method based on fuzzy chance constraint

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0028] 1 Establishment of network structure reconstruction optimization model

[0029] The present invention uses triangular fuzzy variables to represent the operating time of the line, combined with operating experience, for a recoverable line, its operating time is between the optimistic estimate value t 1 and the pessimistic estimate t 3 between, and t 2 is the most likely recovery operation time, the ambiguity of operation time can be expressed by triangular fuzzy variables, and its membership function is shown in formula (1). The ambiguity of other parameters involved in this article can be described and dealt with in a similar way.

[0030]

[0031] In the stage of system network structure reconstruction, for each node to be restored, the nodes passing through the restoration path are considered to be completely reliable, and its restoration relia...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a power system grid structure reconfiguration and optimization method based on fuzzy chance constraints, which belongs to the field of power system security defense and restoration control. The power system grid structure reconfiguration and optimization method comprises a grid structure reconfiguration and optimization model establishing module and a grid structure reconfiguration and optimization algorithm module. The power system grid structure reconfiguration and optimization method adopts triangular fuzzy variables for representing line operation time and restoration reliability, defines an restoration reliability index for evaluating performance of a target grid structure, considers unit start-up time limit, establishes a grid structure reconfiguration and optimization model based on fuzzy chance constraints under the framework of the fuzzy chance constraints, adopts a solution method of combining fuzzy simulation, a crossed particle swarm optimization algorithm and a Dijkstra algorithm, optimizes and determines unit start-up sequence, and reconfigures a restoration grid structure with shortest reconfiguration time and highest reliability. According to the power system grid structure reconfiguration and optimization method based on fuzzy chance constraints, the fuzziness of operation time and restoration reliability when the line is put into operation at the grid structure reconfiguration stage is reasonably considered, the optimized and determined optimal grid structure reconfiguration scheme takes both system reconfiguration speed and safety requirements into account, and the power system grid structure reconfiguration and optimization method has more practical significance.

Description

technical field [0001] The invention relates to a power system grid reconfiguration optimization method based on fuzzy chance constraints, which belongs to the field of power system safety defense and recovery control. technical background [0002] The frequent blackouts in recent years show that blackouts are a serious threat to modern power systems. With the increasing scale of the power system and the continuous improvement of society's dependence on power supply, the consequences of blackouts are becoming more and more serious. The main task of the network structure reconstruction stage is to make full use of the isolated small systems restored in the previous stage, select the appropriate combination of power stations and lines to be restored and determine the corresponding order of operation, transmit power to important power stations as soon as possible and gradually establish Stable grid structure. The quality of system recovery in the stage of network structure re...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J3/00G06Q10/04G06Q50/06
CPCG06Q10/04G06Q50/06H02J3/00H02J3/003H02J2203/20
Inventor 李文云梁海平朱涛顾雪平赵川刘艳李玲芳张雪丽梁铃马腾飞张丹叶华左智波
Owner YUNNAN ELECTRIC POWER DISPATCH CONTROL CENT
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products