A resource scheduling method and resource scheduling system

A resource scheduling and resource technology, applied in the field of cloud computing, can solve problems such as unreasonable scheduling technology incompatible resource allocation, etc.

Active Publication Date: 2018-09-21
CHINA UNITED NETWORK COMM GRP CO LTD
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Embodiments of the present invention provide a resource scheduling method and a resource scheduling system, which can solve the problem of unreasonable resource allocation caused by incompatible scheduling technologies

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A resource scheduling method and resource scheduling system
  • A resource scheduling method and resource scheduling system
  • A resource scheduling method and resource scheduling system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0059] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0060] In order to describe the resource scheduling problem in the virtualization system as a whole, the present invention proposes a centralized resource scheduling system architecture, and based on this architecture, proposes a top-down resource scheduling system, The resource scheduling problem is modeled and a corresponding method is proposed.

[0061] In the embodiment of the present invention, as figure 1 As shown, the above-mentioned centralized resource sc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

An embodiment of the invention provides a resource scheduling method and a resource scheduling system and relates to the field of cloud calculation. The resource scheduling system comprises a management node and physical nodes. According to the resource scheduling method, by the aid of the management node, a resource set corresponding to each application program is acquired according to the scheduling policy of a user when an objection of a scheduling policy is achieved and then is sent to the each physical node; by the aid of each physical node, the minimum quantity of resources distributed to each virtual machine on the corresponding physical node are determined, the left quantity of resources are distributed to every virtual machine on the corresponding physical node proportionally, and the total quantity of resources obtained by each virtual machine after distribution are sent to the management node; by the aid of the management node, resource utilization rate of each physical node is acquired according to the corresponding total quantity of resources of each virtual machine and the current resource utilization amount of each virtual machine on the corresponding physical node, and resource load of each physical node is scheduled according to the resource utilization rate. The resource scheduling method and the resource scheduling system are applied to virtualized resource scheduling and can solve the problem of unreasonable resource distribution caused by an incompatible scheduling technology.

Description

technical field [0001] The invention relates to the field of cloud computing, in particular to a resource scheduling method and a resource scheduling system. Background technique [0002] The scheduling of infrastructure resources in the data center can be divided into three levels, including: resource scheduling at the application layer, resource scheduling at the virtual machine layer, and resource scheduling at the physical machine layer. [0003] Among them, the first-in-first-out queue (First Input First Output, FIFO), fair scheduling algorithm, and computer capacity scheduling algorithm implemented in the software architecture MapReduce for large-scale data set parallel computing belong to the application layer resource scheduling algorithm, and its goal is to maximize Optimize the task throughput of the application layer or minimize the task completion time; the scheduling algorithm of the virtual machine layer can represent the credit scheduler algorithm in the Xen s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F9/50G06F9/455
Inventor 王淑玲冯伟斌王志军
Owner CHINA UNITED NETWORK COMM GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products