Method for selecting main substation capacity and optimal station address of transformer substation
A technology of main transformer capacity and substation, which can be used in instruments, data processing applications, forecasting, etc., and can solve problems such as missing optimal solutions.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] Below in conjunction with embodiment the present invention is described in further detail:
[0038] The present invention includes a substation site selection method and a substation capacity determination method, wherein:
[0039] The substation site selection method is as follows: According to the load forecast results of the power grid in the planning area, the optimal geometric position of the substation site in the planning area is calculated by recursive method, and the specific location is determined considering the actual geographical location factors, as follows.
[0040] 1. Load Forecasting
[0041] 1. Load type
[0042] As a product of the new stage of urbanization, there is no essential difference between new-type towns and old towns in terms of load categories, but there are essential differences in the load structure closely related to power supply capacity and the time when the maximum load occurs. Therefore, in the traditional load classification On th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com