Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method of corrugated steel web PC box girder cable-stayed bridge

A corrugated steel web, construction method technology, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of increasing the weight and cost of hanging baskets, unfavorable stress on bridge structures, complicated processes, etc., so as to reduce the difficulty of construction. and workload, weight reduction, and the effect of optimal economy

Active Publication Date: 2015-11-25
SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD
View PDF6 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The traditional hanging basket cantilever construction technology of the rear fulcrum adopts the simultaneous pouring of the top and bottom slab concrete and the hanging basket bears almost all the segment weight, which increases the weight and cost of the hanging basket, and the increased weight of the hanging basket is also extremely unfavorable to the force of the bridge structure constructed by the cantilever
Although the cantilever construction technology of the front fulcrum hanging basket can reduce the weight of the hanging basket, it needs to adjust the cable in stages and must set the rotating anchor when pouring a section, which is a complicated process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of corrugated steel web PC box girder cable-stayed bridge
  • Construction method of corrugated steel web PC box girder cable-stayed bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0014] Embodiment: This embodiment specifically relates to a construction method for a PC box girder cable-stayed bridge with corrugated steel webs suitable for single-box multi-chamber and multi-box multi-chamber. The corrugated steel web is hoisted first, connected to the poured PC box girder through welds and high-strength bolts, so that the hanging basket and the corrugated steel web share the weight of the bottom slab concrete of the current section; after the bottom slab concrete reaches a certain strength, the top slab concrete is poured. The bottom plate, the corrugated steel web and the hanging basket are used to bear the concrete weight of the roof; one segment cycle, the construction load borne by the hanging basket is only the weight of the hanging basket and part of the weight of the top and bottom plates, and the hanging basket can be designed to be lighter.

[0015] like figure 1 , 2 As shown, the construction method of the corrugated steel web PC box girder ca...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a corrugated steel web PC box girder cable-stayed bridge. The method includes the following steps that the Nth corrugated steel web section is hoisted and longitudinally connected with the N-1th corrugated steel web section in place; a hanging basket is moved forwards and pulls the N-1th corrugated steel web section through stay cables; a bottom die is erected below the Nth corrugated steel web section, and a concrete bottom plate of the Nth corrugated steel web section is poured on the bottom die; after the concrete bottom plate is maintained and reaches preset strength, a steel tube support and a top die are sequentially erected on the concrete bottom plate from bottom to top, and a concrete top plate is poured on the top die; after the concrete top plate is maintained and reaches the preset strength, longitudinal and transverse pre-stress ribs in the concrete bottom plate and the concrete top plate are pulled to complete construction of one section. The method has the advantages that concrete of the top plate and the bottom plate of a corrugated steel web PC box girder is poured in different stages, and bearing capacity of an existing structure of the section is fully used to bear the dead load and the weight of a subsequent structure, so that the construction load of the hanging basket is reduced.

Description

technical field [0001] The invention belongs to the technical field of bridge engineering, and in particular relates to a construction method of a PC box girder cable-stayed bridge with corrugated steel webs. Background technique [0002] my country's research on PC box girder bridges with corrugated steel webs began in the mid-1990s, and more than 30 PC box girder bridges with corrugated steel webs have been built, most of which are simply supported girder bridges and continuous girder bridges. The understanding of PC box girder with web is becoming more and more mature, but for the construction method of PC box girder cable-stayed bridge with corrugated steel web, the theoretical research and practical experience are still insufficient. The traditional cantilever construction technology of the rear fulcrum hanging basket adopts the simultaneous pouring of the top and bottom slab concrete and the hanging basket bears almost all the segment weight, which increases the weight ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/10
Inventor 黄永春陈立生赵国强万义辉刘中杰
Owner SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More