A construction technique involving the raising method of a gas shaft passing through a strong water-rich rock formation
It is a construction technology and vertical well technology, which is applied in the direction of gas discharge, wellbore/well components, drilling equipment, etc., and can solve the problems of shortening the construction period and cost of gas riser installation and construction, large water gushing plugging, pressure difference inside and outside the pipe, etc. Achieve the effect of solving the problem of pressure difference inside and outside the pipe, shortening the construction period and cost, and broadening the application range
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] In order to clearly illustrate the solutions of the present invention, preferred embodiments are given below and detailed descriptions are given in conjunction with the accompanying drawings.
[0043] In this embodiment, the gas drainage shaft of Shihao Mine of Chongqing Songzao Coal and Electricity Company is taken as an example. The construction process of the gas drainage shaft includes the following steps:
[0044] (1) Gas shaft excavation.
[0045]In this embodiment, the gas shaft 14 is constructed by raising the drilling rig, and the pilot hole is reamed into a gas shaft 14 with a diameter of 1.65m. It is 20m3 / h, and the hole bottom deviation is 0.54%. . During the pilot hole drilling process, the drilling rig transmits the thrust and torque to the power head through the main thrust cylinder and the motor, and the power head transmits the thrust and torque to the pilot hole drill bit through the drill rod, and the hob on the pilot hole drill bit is cut by rollin...