Identification method and system of new building
An identification method and building technology, applied in the identification and system fields of new buildings, can solve problems such as insufficient intelligence, inability to understand the media in a timely and effective manner, and information lag, and achieve the effect of ensuring practicability and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0130] Please refer to figure 2 and image 3 , Embodiment 1 of the present invention is:
[0131] A method for identifying newly added buildings, comprising:
[0132] S1: Obtain the driving data of the engineering vehicle for nearly one month; the driving data of the engineering vehicle is collected regularly according to the preset collection cycle T by using the on-board positioning system loaded on the engineering vehicle, including the ID number of the engineering vehicle within the preset time length , current time point, GPS speed and location point and other information; the ID number can be the license plate number or other numbers of the engineering vehicle; and the driving data is transmitted to the data center through wireless mobile communication technologies such as mobile cellular communication technology, Provide a reliable data analysis basis for the data center's subsequent statistical analysis of the driving data of engineering vehicles. The acquisition p...
Embodiment 2
[0168] Please refer to Figure 4 , Figure 6 and Figure 7 , the second embodiment of the present invention is:
[0169] An identification system for newly added buildings, comprising:
[0170] The first acquisition module 1 is used to acquire the driving data of all engineering vehicles within a preset time period; the driving data includes the number, speed, time point and location point information of the engineering vehicles;
[0171] The second acquisition module 2 is used to acquire construction vehicles with parking behavior according to the driving data;
[0172] The marking module 3 is used to mark the stop point of the engineering vehicle according to the position point recorded in the driving data;
[0173] The third obtaining module 4 is used to obtain the first driving trajectory corresponding to each engineering vehicle with the parking behavior;
[0174] The fourth acquisition module 5 is used to acquire the first driving track set corresponding to all engi...
Embodiment 3
[0190] Please refer to Figure 5 , the third embodiment of the present invention is:
[0191] An identification system for newly added buildings, comprising:
[0192] The first acquisition module 1 is used to acquire the driving data of all engineering vehicles within a preset time period; the driving data includes the number, speed, time point and position point information of the engineering vehicles;
[0193] The second acquisition module 2 is used to acquire construction vehicles with parking behavior according to the driving data;
[0194] The marking module 3 is used to mark the stop point of the engineering vehicle according to the position point recorded in the driving data;
[0195] The third obtaining module 4 is used to obtain the first driving trajectory corresponding to each engineering vehicle with the parking behavior;
[0196] The fourth acquisition module 5 is used to acquire the first driving track set corresponding to all engineering vehicles with stop be...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com