Steel truss girder suspension bridge deck slab deviation-rectifying, resetting and pushing construction system and method
A technology of jacking construction and bridge deck, applied in the direction of bridge, bridge maintenance, bridge reinforcement, etc., can solve the problems of high maintenance and construction cost, difficult implementation and low cost, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] In order to meet the requirement of rectifying the bridge deck of a steel truss girder suspension bridge under the condition of not restricting traffic, the present invention provides a deflection rectifying and reset jacking construction system and method for the deck of a steel truss suspension bridge. The specific embodiment of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0030] Such as figure 1 As shown, the steel truss girder suspension bridge bridge deck deflection correction reset reset push construction system includes a restraint limit device 7 and a reset displacement measurement device 8 .
[0031] Such as figure 2 As shown, the restraining and limiting device 7 includes a lower end plate 10 , an upper end plate 9 and a support slanting rod 11 . The lower end plate 10 is welded to the upper chord 4 of the steel truss beam fixedly connected to the steel truss girder 1 , and the upper end plate 9 is...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 