A test method and color retention technology, applied in the direction of measuring devices, instruments, scientific instruments, etc., can solve the problems of large impact on the environment and climate, deviation of test results, high subjectivity, etc., and achieve the effect of shortening test time and rapid test
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] This embodiment includes the following steps:
[0029] Step 1: Scrape the putty layer: Scrape the putty layer on the wall or test board, let the wall or test board cure for 18 hours, then proceed to the next step;
[0030] Step 2: Coating the top coat to be tested: Coat the top coat to be tested on the putty layer of the wall or test panel, the coating rate of the top coat to be tested is 8㎡ / kg, let the wall or test panel cure for 18 hours , Proceed to the next step;
[0031] Step 3: Coating PVA-iron blue water solution: Coat a PVA-iron blue water solution on the wall or test panel, let the wall or test panel cure 18, then proceed to the next step;
[0032] Step 4: Observation test: Let the wall or test panel be exposed outdoors for a long time until the PVA-iron blue aqueous solution on the surface completely changes color, and perform 4 observation records during the exposure of the wall or test panel. The method is:
[0033] a. Use the CM-2600D color measuring instrument pro...
Embodiment 2
[0039] This embodiment includes the following steps:
[0040] Step 1: Scrape the putty layer: Scrape the putty layer on the wall or test board, let the wall or test board cure for 18 hours, then proceed to the next step;
[0041] Step 2: Coating the top coat to be tested: Coat the top coat to be tested on the putty layer of the wall or test panel, the coating rate of the top coat to be tested is 8㎡ / kg, let the wall or test panel cure for 18 hours , Proceed to the next step;
[0042] Step 3: Coating PVA-iron blue water solution: Coat a PVA-iron blue water solution on the wall or test panel, let the wall or test panel cure 18, then proceed to the next step;
[0043] Step 4: Observation test: Let the wall or test panel be exposed outdoors for a long time until the PVA-iron blue aqueous solution on the surface completely changes color, and perform 4 observation records during the exposure of the wall or test panel. The method is:
[0044] a. Use the CM-2600D color measuring instrument pro...
Embodiment 3
[0050] This embodiment includes the following steps:
[0051] Step 1: Scrape the putty layer: Scrape the putty layer on the wall or test board, let the wall or test board cure for 24 hours, then proceed to the next step;
[0052] Step A: Coating primer: Apply primer that matches the top paint to be tested on the putty layer of the wall or test panel, then let the wall or test panel dry for 24 hours, and wait for the bottom of the wall or test panel After the paint dries, proceed to the next step;
[0053] Step 2: Coating the top coat to be tested: Coat the top coat to be tested on the putty layer of the wall or test panel, the coating rate of the top coat to be tested is 12㎡ / kg, let the wall or test panel cure for 24 hours , Proceed to the next step;
[0054] Step 3: Coating PVA-iron blue aqueous solution: Coat two PVA-iron blue aqueous solutions on the wall or test panel, let the wall or test panel cure for 24 hours, then proceed to the next step;
[0055] Step 4: Observation test: L...