A blasting method for a separate upper-span bridge
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A separate, bridge-spanning technology, which is applied in bridges, bridge construction, bridge maintenance, etc., can solve the problems of large blasting bridge blocks, troublesome operation of pretreatment and cutting steel bars, and road damage, so as to reduce pretreatment links and save repairs Funding and time, overcoming the effect of long-term closure
Active Publication Date: 2017-08-08
CHINA RAILWAY NO 2 ENG GRP CO LTD +1
View PDF5 Cites 2 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0005] The purpose of the present invention is to overcome the conventional static cutting method and mechanical demolition method existing in the prior art, which need to close the road for a long time when demolishing the bridge, and at the same time, the existing demolition method combined with cutting blasting and drilling blasting brings unexpected problems. To deal with the above-mentioned shortcomings of troublesome operation of cutting steel bars, large blasting bridge blocks, and easy damage to the road surface, a separate upper span can be provided that reduces the pretreatment process, effectively reduces the single volume of the blasting body and saves the demolition time bridge blasting method
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0040] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.
[0041] likefigure 1 , 2 As shown, a separated upper span bridge according to the present invention mainly relates to a hingeless reinforced concrete slab arch bridge, including a main arch ring 1 and a small arch ring 2, wherein the main arch ring 1 includes a vault 11, a soffit 12 and an arch Feet 13, the top of the vault 11 and the soffit 12 is a small arch ring 2, the small arch ring 2 is separated from the main arch ring 1 by several columns 21, and the bridge deck 3 is above all the columns 21.
[0042] The blasting method of the separated upper span bridge, such as figure 1 ,...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention discloses a blasting method of a separated type overpass. The blasting method of the separated type overpass includes the steps that (1) blasting cuts are designed, specifically, the blasting cuts are designed in the arch apex, arch soffits and arch feet of a bridge main arch ring correspondingly, and the blasting cuts are designed in part of stand columns of bridge small arch rings; (2) blasting points are designed, specifically, the multiple blasting points are designed on the bridge main arch ring and the small arch rings; (3) a blasting sequence is set, specifically, the arch apex, the arch feet, the arch soffits and the stand columns of the bridge are blasted in sequence; (4) blasting is performed, specifically, the bridge is blasted in the blasting sequence of the step (3); and (5) site cleaning is performed, specifically, ballast built after bridge blasting is cleaned up, and bridge blasting is completed. By means of the blasting method of the separated type overpass, the weight of a single blasted body can be effectively reduced, and the influence of dismantled bodies on the road surface and an underground pipeline is small; and during construction, a pre-treatment link of blasting construction is omitted, the whole structure of the bridge is not damaged, the traffic safety in the construction process is guaranteed, the whole road closure time is shortened, and the blasting method is safe, reliable and high in efficiency.
Description
technical field [0001] The invention relates to the technical field of blasting engineering, in particular to a blasting method for a separated upper-span bridge. Background technique [0002] With the rapid development of the domestic economy, in order to meet the increasing traffic requirements, many expressways need to be expanded and reconstructed, and a large number of overpasses that cross expressways need to be demolished for various reasons. For the demolition of expressway overpasses, different demolition methods must be selected according to its own characteristics and environmental factors, and the impact on vehicle traffic must also be considered. At present, the demolition of the upper span of the hingeless reinforced concrete slab arch bridge mostly adopts the static cutting method and the mechanical demolition method, and there are few reports on the demolition of this kind of arch bridge by blasting technology. [0003] For the above-mentioned static cutting...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.