A soil pre-reinforcement method for grooved construction of an underground diaphragm wall in a thick silt layer

An underground continuous wall and grooved construction technology, which is applied in sheet pile walls, soil protection, infrastructure engineering, etc., can solve the problems of long construction period, inability to reinforce, and high cost.

Active Publication Date: 2018-05-04
CHINA RAILWAY 16 BUREAU GRP BEIJING METRO ENG CONSTR +2
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the defects in the prior art, the purpose of the present invention is to provide a soil pre-reinforcement method for underground diaphragm wall trough construction in a thick silt layer, by calculating the minimum reinforcement width of thick silt on both sides of the underground diaphragm wall trough wall to ensure The stability of the tank wall during tank construction; the combination of cement mixing piles and CFG piles is used to reinforce thick silt soil, which overcomes the shortcomings and shortcomings of long construction period, high cost and even inability to reinforce in the prior art, and realizes Efficient Consolidation Construction of Thick Silt Soil

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A soil pre-reinforcement method for grooved construction of an underground diaphragm wall in a thick silt layer
  • A soil pre-reinforcement method for grooved construction of an underground diaphragm wall in a thick silt layer
  • A soil pre-reinforcement method for grooved construction of an underground diaphragm wall in a thick silt layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0082] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0083] In this embodiment, the foundation pit of a station is taken as an example. The station design starting mileage is DK79+338.678, and the end mileage is DK79+653.678. The station is constructed by open cut method, and its enclosure structure adopts the enclosure structure form of underground diaphragm wall plus internal support, and the thickness of the underground diaphragm wall is 800mm. The foundation pit of the station is about 315m long, 16.8-18.7m deep, and 21.3-37.8m wide. According ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a soil mass pre-reinforcement method for trench construction of an underground diaphragm wall in a thick mud layer. The soil mass pre-reinforcement method for trench construction of the underground diaphragm wall in the thick mud layer comprises the following steps: (1) geologically examining a construction site and determining soil layer division information; (2) determining a thick mud layer reinforcement method, namely reinforcing mud soil in an isolating manner by combination of cement mixing piles and CFG piles; (3) determining minimum reinforcement widths of two sides of a trench wall of the underground diaphragm wall; and (4) reinforcing thick mud on two sides of the trench wall of the underground diaphragm wall by using the cement mixing piles and the CFG piles. The minimum reinforcement widths of the thick mud on the two sides of the trench wall of the underground diaphragm wall are calculated to guarantee stability of the trench wall during trench construction; and the thick mud soil is reinforced by the combination of the cement mixing piles and the CFG piles, shortcomings that construction period is long, cost is high, and even reinforcement cannot be implemented in the prior art are overcome, and therefore, efficient reinforcement construction of the thick mud soil is realized.

Description

technical field [0001] The invention relates to a construction method in the technical field of underground construction engineering, in particular to a soil pre-reinforcement method for trench construction of an underground diaphragm wall in a thick mud layer. Background technique [0002] Major cities across the country are building urban underground railways and various underground spaces on a large scale. These underground space structures need to be constructed by excavating foundation pits, and underground diaphragm walls are required as temporary structures for retaining soil and water during excavation of foundation pits. Due to the different geological conditions and surrounding environments of each city, it is necessary to build underground diaphragm walls under various geological conditions. The construction technology of underground diaphragm wall has been widely used in my country's natural sedimentary sandy soil, cohesive soil and other soft soil strata. But ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D3/08E02D5/46
CPCE02D3/08E02D5/46
Inventor 马栋张伟森赵守宪王耀东吴大勇沈水龙刘晓雪吴怀娜刘元鹏张志坤陈培新周全赵洪星刘志峰宋阳春李勇马超
Owner CHINA RAILWAY 16 BUREAU GRP BEIJING METRO ENG CONSTR