The technology of a water-stop curtain and construction method is applied in the direction of basic structure engineering, building, sheet pile wall, etc., which can solve the problems of inappropriateness, high process cost, and high cost of ground-connected walls, and achieve good water-stop effect, simple process, low cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The present invention is described in further detail below by specific embodiment, and following embodiment is descriptive only, is not limiting, can not limit protection scope of the present invention with this.
[0029] A construction method for soil replacement and stirring water-stop curtain, the steps of the method are:
[0030] ⑴. Place the pilot hole pile position according to the axis of the cement mixing pile; deploy the pilot hole pile position according to the axis of the three-axis mixing pile φ1000@1200.
[0031] (2) Lay the steel casing and use mud to stabilize the hole wall. The mud is made of high-quality clay mixed with water and mixed with a certain proportion of bentonite to prepare the mud. The soil to be excavated in the hole is taken out by the wet operation of the rotary excavator; the height of the steel casing is 2m, the diameter of the steel casing is 20cm larger than the designed pile diameter, and the top surface of the steel casing is 30cm h...