A construction method for steel pipe columns in subway underground excavation stations
A construction method and steel pipe column technology, applied in the field of steel pipe column positioning, can solve the problems of time-consuming, etc., and achieve the effects of reducing installation time, ensuring installation accuracy, and saving construction materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
[0019] A construction method for a steel pipe column in a subway underground excavation station of the present invention, the method comprises the following steps:
[0020] S1 Removal of pile heads: pumping out the mud remaining in the pile after pouring under water. The mud in the pile is pumped out with a submersible mud pump. Part of the mud that cannot be pumped out by the submersible pump at the bottom needs to be manually removed; after the mud in the pile is pumped out, it is ventilated into the pi...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com