A bollard for simulating mooring systems at different water depths
A mooring system and mooring column technology, applied in the field of ocean engineering model tests, can solve the problems of not installing false bottom facilities, etc., and achieve the effect of no loss of test accuracy, relatively high cost, and low cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Example 1: Combining Figure 1 to Figure 3 , mainly including tie anchor post ①, support reinforcement bar ②, tie anchor post base ③ and tie anchor point adjuster ④, each tie anchor post corresponds to a tie anchor point, and the present invention can be used alone or in groups.
[0019] The anchor post base is placed horizontally, the anchor post is placed vertically, the bottom end of the anchor post is fixedly installed in the center of the anchor post base, the anchor point adjuster is placed on the anchor post, adjusted to the set position and then closed and fixed , tie one end of the anchor line to the mooring hole; then lower the mooring post to the pre-set position in the pool. That is to say, the present invention includes the anchor post ①, the anchor post base ③ and the anchor point regulator ④ arranged on the anchor post, and the anchor hole ⑤ is set on the anchor point regulator ④, and the anchor hole ⑤ is connected to the Line connection, that is, the mo...
Embodiment 2
[0020] Embodiment two: based on the above embodiment and in combination with Figure 4 , the present invention can also be that: the anchor point adjuster includes two semicircular rings, and one end of the two semicircular rings is hinged together, and the other end is detachably connected by a loose screw ⑥, and the anchor hole is arranged on the bolt Connected ends,.
Embodiment 3
[0021] Embodiment 3: Based on the above-mentioned embodiment, the present invention can also be: the said supporting reinforcing bar has two inner and outer layers respectively, and each layer is evenly provided with three bars, that is, one end of each bar is fixedly connected with the tie anchor column, and the other end is connected with the anchor post. Bollard base fixed connection;.