Preparation method of modified emulsified asphalt waterproof coating
A technology for emulsified asphalt and waterproof coating, applied in the direction of asphalt coating, anti-corrosion coating, coating, etc., can solve the problems of poor product stability, high production cost, short shelf life, etc., to achieve strong adhesion, simplified production process, and improved production. The effect of efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] The present invention comprises the following steps:
[0020] A. First heat the base asphalt to 120°C, then add 5% SBR asphalt modifier and use a high-speed dispersing and shearing emulsifier to fully insulate and stir for 2 hours;
[0021] B. After lowering the temperature to 80°C, add 5% OP-10 emulsifier and stir well for 2 hours to obtain the base material;
[0022] C. The temperature of the base material is kept at 80°C, and it is mixed with water at the same temperature at a ratio of 1:1 using a high-speed dispersing shear emulsifier for 2 hours, and finally the finished product is obtained.
Embodiment 2
[0024] The present invention comprises the following steps:
[0025] A. First heat the base asphalt to 120°C, then add 15% SBR asphalt modifier and use a high-speed dispersing and shearing emulsifier to fully insulate and stir for 2.5 hours;
[0026] B. After lowering the temperature to 100°C, add 10% OP-1 emulsifier and stir thoroughly for 2.5 hours to obtain the base material;
[0027] C. The temperature of the base material is kept at 93°C, and it is mixed with water at the same temperature at a ratio of 1:1 using a high-speed dispersing shear emulsifier for 5 hours, and finally the finished product is obtained.
Embodiment 3
[0029] The present invention comprises the following steps:
[0030] A. First heat the base asphalt to 120°C, then add 20% SBR asphalt modifier and use a high-speed dispersing and shearing emulsifier to fully insulate and stir for 5 hours;
[0031] B. After the temperature is lowered to 110°C, add 15% carboxylate emulsifier (anionic emulsifier) and fully stir for 3 hours to obtain the base material;
[0032] C. The temperature of the base material is kept at 100°C, and it is mixed with water at the same temperature at a ratio of 1:1 using a high-speed dispersing shear emulsifier for 5 hours, and finally the finished product is obtained.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

