Railway train out report device and system
A railway and confirmed reporting technology, applied in transmission systems, railway car body parts, roads, etc., can solve problems such as poor accuracy and real-time performance of assured information, and achieve the effect of solving low efficiency and reducing manual intervention.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] This embodiment provides a railway confirmation device, such as figure 1 As shown, the railway confirmation device includes: a main control board 1, which is equipped with a train information receiving module 11 communicating with the automatic railway number identification system AEI of all stations along the railway; and a core board 2, which is connected to the main control board 1, and the core board 2 is equipped with a processor 21 communicating with the train information receiving module 11, and the processor 21 compares the train information of the current station and the rear station acquired by the train information receiving module to generate Confirm the information.
[0035] Wherein, it is preferable to place the railway confirmation device of this embodiment together with the AEI equipment at the exit of the truck station, so as to ensure the communication between the railway confirmation device and the AEI equipment, and facilitate the railway confirmatio...
Embodiment 2
[0044] On the basis of Embodiment 1, in order to ensure the integrity and aesthetics of the railway confirmation device, this embodiment proposes a railway confirmation device with higher integration, such as image 3 As shown, the railway confirmation device is also equipped with a box body 3, and the main control board 1 and the core board 2 are installed in the box body 3.
[0045] Further, a power supply device 4 may also be installed in the box body 3 to supply power to the main control board 1 and the core board 2, and the power supply device 4 may include a switching power supply, a battery pack, and the like. The power supply device 4 can be connected with the main control board 1 to monitor the power of the power supply device 4 through the power monitoring module 15 on the main control board 1 .
[0046] Preferably, a display device 5 can also be installed in the box body 3, and the display device 5 is connected to the processor 21 for displaying train information, c...
Embodiment 3
[0052] On the basis of Embodiment 1 and Embodiment 2, this embodiment provides a railway confirmation system, such as Figure 4 As shown, the railway confirmation system includes: a plurality of railway confirmation devices 41, wherein each of the railway confirmation devices is respectively installed at a station, and each of the railway confirmation devices communicates with each other; a database server 42, and Each of the railway confirmation devices communicates to receive and store the report information sent by each railway confirmation device. Here, the railway confirmation device may be the railway confirmation device in Embodiment 1 or Embodiment 2.
[0053] Through the railway confirmation device arranged at each station and the database server arranged in the railway control center, the confirmation information of each station can be managed in real time, and the station and the central database can be notified in time to update and change the confirmation informat...
PUM