Extradeep well bottom ore fine recycling shaft and fast construction supporting method thereof
A technology for ultra-deep wells and fine ore, which is used in shaft equipment, well sinking, mining equipment, etc., can solve problems such as collapse, shaft wall, affecting safe and stable operation, etc., to enhance strength, ensure stable operation, and improve operating environment. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] The powder ore recovery shaft at the bottom of the ultra-deep shaft includes a lining board 1, welding studs 2, surrounding rock 3, and a concrete support layer 4. The lining board 1 is arranged inside the surrounding rock 3, and the welding studs 2 are evenly arranged in a staggered manner. On the outer wall of the liner 1, welding studs 2 and the liner 1 are connected by welding; there is a pouring gap between the liner 1 and the surrounding rock 3, and the gap between the liner 1 and the surrounding rock 3 is poured with Concrete support layer 4; when the surrounding rock 3 is under-excavated h 2 , the relationship between the length L of the welding stud 2 and the thickness D of the concrete support layer 4 is D=L+h 1 , reserve undercut thickness h 2 It is to ensure that when the surrounding rock 3 is under-excavated, the welding stud 2 still has the concrete protective layer thickness h required by the specification 1 , to ensure the support strength of the ultra...
Embodiment 2
[0035] The powder ore recovery shaft at the bottom of the ultra-deep shaft includes a lining board 1, welding studs 2, surrounding rock 3, and a concrete support layer 4. The lining board 1 is arranged inside the surrounding rock 3, and the welding studs 2 are evenly arranged in a staggered manner. On the outer wall of the liner 1, welding studs 2 and the liner 1 are connected by welding; there is a pouring gap between the liner 1 and the surrounding rock 3, and the gap between the liner 1 and the surrounding rock 3 is poured with Concrete support layer 4. When there is no under-excavation in the surrounding rock 3, the relationship between the length L of the welding stud 2 and the thickness D of the concrete support layer 4 is D=L+h 1 + h 2 , the thickness of the concrete support layer 4 is expanded to enhance the support strength of the ultra-deep shaft bottom powder ore recovery shaft, to ensure that the surrounding rock 3 can work stably, and to ensure the stable operati...