A construction method for polymer grouting to reinforce anti-subsidence high embankment and widen subgrade
A construction method and high polymer technology, applied in infrastructure engineering, roads, excavation, etc., can solve problems such as slope slides and subgrade lateral slides, and achieve not easy slides, effective slope protection, and stable joints Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] The high polymer grouting in this embodiment to strengthen the subsidence and widen the subgrade is implemented for the low embankment, and the low embankment refers to the embankment whose height is not greater than 1.5m.
[0050] Such as figure 1 As shown, for the low embankment, the interface between the old subgrade and the new subgrade is set as the slope interface 4a, the filling layer 1 is filled and compacted in layers according to the height of the embankment, and the geotechnical pipe network is laid on the top surface of the filling layer 1; The geotechnical pipe network is formed by grouting with polymer slurry to form the geotechnical pipe network 2a for grouting the filling layer, and the vertical filling layer reinforcement column 3a that penetrates the slope interface 4a and extends into the foundation; There is a road shoulder geotechnical pipe network extending on the subgrade, and the road shoulder geotechnical pipe network is formed by grouting with ...
Embodiment 2
[0060] In this embodiment, polymer grouting to reinforce anti-subsidence and widen the subgrade is aimed at general embankments or high embankments. General embankments refer to embankments whose height is between 1.5m and 18m, and high embankments refer to embankments whose height is not less than 18m.
[0061] Such as figure 2 As shown, for general embankment or high embankment: the interface between the old subgrade and the new subgrade is set as the step interface 4b, and the filling layer 1 is filled and compacted in layers according to the height of the corresponding step in the step interface 4b, forming various The filling layer is layered, and the geotechnical pipe network is laid on the top surface of each layer of filling layer and extended to the top surface of the corresponding layer of steps to form an interlayer geotechnical pipe network; for the interlayer geotechnical pipe network, the high polymer slurry is injected The grout forms the interlayer grouting ge...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com