A pipe string structure of a coalbed methane well and a coalbed methane well system
A coalbed methane well and pipe string technology, which is applied to the field of pipe string structure and coalbed methane well system, can solve the problems of increasing development cost, affecting the pumping and discharging of pipe string structure, affecting the normal operation of pump body, etc., so as to reduce development cost and reduce pump inspection. effect of work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as figure 1 As shown, this embodiment provides a pipe string structure of a coalbed methane well, the pipe string structure is located in the casing 1 of the coalbed methane well, and the pipe string structure includes: a tailpipe 2, a tubing variable diameter joint 3, and a tubular pump 4 , sucker rod 5, tubing 6 and echo mark 7;
[0036] The bottom end surface of the tail pipe 2 is opposite to the inner bottom surface of the casing 1. The tail pipe 2 is fixedly connected to the pump barrel of the tubular pump 4 through the reducing joint 3 of the oil pipe, and the pump barrel of the tubular pump 4 is fixedly connected to the oil pipe 6. The rod 5 is located in the oil pipe 6 and is fixedly connected with the plunger 41 of the tubular pump 4; the echo mark 7 is fixedly sleeved on the outer wall of the oil pipe 6;
[0037] The inner diameter of the tail pipe 2 is greater than the inner diameter of the pump barrel of the tubular pump 4 , and the inner diameter of t...
Embodiment 2
[0060] This embodiment provides a coalbed methane well system, which includes figure 1 The string structure shown.
[0061] The coalbed methane well system in this embodiment includes a pipe string structure, which can prevent solid particles from depositing in the tubular pump 4, effectively solving the problem that the tubular pump 4 cannot work normally due to the deposition of solid particles. A large number of pump inspection operations are reduced, which meets the principle of continuous and stable drainage and gas recovery of coalbed methane wells. At the same time, due to the string structure, components such as screens and plugs are omitted, and development costs are reduced.
[0062] The serial numbers of the above embodiments of the present invention are for description only, and do not represent the advantages and disadvantages of the embodiments.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


