Unlock instant, AI-driven research and patent intelligence for your innovation.

BIM (building information model)-based construction industry rural migrant worker optimal selection management method

A management method and technology of migrant workers, applied in the field of optimal management of migrant workers in the construction industry based on BIM, can solve problems such as the inability to hire migrant workers, frequent safety accidents in the construction industry, and lack of technical level and work attitude of migrant workers in employers, etc. Achieve the effect of improving work consciousness and autonomy

Inactive Publication Date: 2017-03-08
YANSHAN UNIV
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Most of the existing practices are that contractors recruit and manage migrant workers. Employing companies lack scientific methods to identify the technical level and work attitude of migrant workers, and cannot hire migrant workers suitable for the characteristics of the project. A series of industry-derived problems such as frequent accidents and hidden dangers in construction quality
At present, there is no research on the introduction of BIM technology into the optimal management of migrant workers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM (building information model)-based construction industry rural migrant worker optimal selection management method
  • BIM (building information model)-based construction industry rural migrant worker optimal selection management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.

[0027] A BIM-based optimal management method for migrant workers in the construction industry of the present invention, figure 2 Shown is the detailed flowchart of the preferred management method of migrant workers in the construction industry of the present invention, the method may further comprise the steps:

[0028] Step 1: Relevant departments establish a migrant worker optimization management system, and design migrant workers to hold IC cards according to the corresponding functions and safety requirements of the system; figure 1 Shown is the preferred management system for migrant workers of the present invention and the IC card design structure diagram;

[0029] The migrant worker optimization management system includes public information and confidential information: public information includes basic personal information and work i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM (building information model)-based construction industry rural migrant worker optimal selection management method. The method includes the following steps that: a rural migrant worker optimal selection management system is established, rural migrant worker IC cards matched with the system are designed; an enterprise establishes an BIM (building information model) according to building information so as to carry out construction simulation, so that rural migrant worker selection conditions are summarized; initial rural migrant worker selection is performed in the rural migrant worker optimal selection management system according to the rural migrant worker selection conditions; when a construction phase comes, specific construction conditions are compared with the construction simulation of the BIM, so that the re-selection of rural migrant workers is realized, work information is fed back to the rural migrant worker optimal selection management system periodically, the previous operation is circulated until a project is terminated. The invention also provides a rural migrant worker optimal selection management system. According to the BIM-based construction industry rural migrant worker optimal selection management method, the whole work process of the rural migrant workers can be effectively monitored and recorded based on the construction simulation of the BIM and the rural migrant worker optimal selection management system, rural migrant workers who satisfy the requirements of the project can be deployed optimally, and the rural migrant workers can be re-selected according to construction conditions, the rural migrant worker optimal selection management system can be improved simultaneously, and related construction industry derivational problems caused by problems in rural migrant worker selection can be solved.

Description

technical field [0001] The invention relates to optimal management of migrant workers in the construction industry, in particular to a BIM (Building Information Model)-based optimal management method for migrant workers in the construction industry. Background technique [0002] In our country, the construction industry needs a large number of migrant workers. Due to the characteristics of the industry, farmers' tools have great liquidity and instability. Most of the existing practices are that contractors recruit and manage migrant workers. Employing companies lack scientific methods to identify the technical level and work attitude of migrant workers, and cannot hire migrant workers suitable for the characteristics of the project. A series of industry-derived problems such as frequent accidents and hidden dangers in construction quality. [0003] BIM can realize multi-department and multi-type information sharing and transmission. The use of BIM technology can simulate t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10
CPCG06Q10/1053G06Q10/06398
Inventor 潘鹏程彭小洁王阳
Owner YANSHAN UNIV