BIM (building information model)-based construction industry rural migrant worker optimal selection management method
A management method and technology of migrant workers, applied in the field of optimal management of migrant workers in the construction industry based on BIM, can solve problems such as the inability to hire migrant workers, frequent safety accidents in the construction industry, and lack of technical level and work attitude of migrant workers in employers, etc. Achieve the effect of improving work consciousness and autonomy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0027] A BIM-based optimal management method for migrant workers in the construction industry of the present invention, figure 2 Shown is the detailed flowchart of the preferred management method of migrant workers in the construction industry of the present invention, the method may further comprise the steps:
[0028] Step 1: Relevant departments establish a migrant worker optimization management system, and design migrant workers to hold IC cards according to the corresponding functions and safety requirements of the system; figure 1 Shown is the preferred management system for migrant workers of the present invention and the IC card design structure diagram;
[0029] The migrant worker optimization management system includes public information and confidential information: public information includes basic personal information and work i...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

