Utilization method of livestock and poultry slaughtering waste
A waste, livestock and poultry technology, applied in the field of utilization of livestock and poultry slaughtering waste, to achieve the effects of excellent cost performance, prolonged coagulation time, and enhanced flexural strength
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0026] Example 2 Add 8 parts of pork bone, 40 parts of pork, 2 parts of pig fur, 45 parts of concentrated hydrochloric acid and 95 parts of water into the reactor, stir for acid hydrolysis, the hydrolysis temperature is 94°C, and the hydrolysis time is 7 hours. Cool down after the reaction , filtered to obtain the mixed solution; adding trisodium phosphate solution, modifying the pH of the mixed solution to 8, and obtaining a gypsum retarder.
[0027] The desulfurization hemihydrate gypsum was mixed with the retarder (in terms of solid content) prepared in this example, and the water-material ratio was 0.58, and the setting time and strength performance tests were carried out.
Embodiment 3
[0028] Example 3 Add 12 parts of sheep bone, 25 parts of mutton, 5 parts of sheep fur, 40 parts of concentrated hydrochloric acid and 100 parts of water into the reactor, stir for acid hydrolysis, the hydrolysis temperature is 90°C, and the hydrolysis time is 5 hours. Cool down after the reaction , and filtered to obtain the mixed solution; adding trisodium phosphate solution to modify the pH of the mixed solution to 9 to obtain a gypsum retarder.
[0029] The desulfurization hemihydrate gypsum was mixed with the retarder (in terms of solid content) prepared in this example, and the water-material ratio was 0.58, and the setting time and strength performance tests were carried out.
Embodiment 4
[0030] Example 4 Add 47 parts of chicken, 5 parts of chicken feathers, 47 parts of concentrated hydrochloric acid and 92 parts of water into the reactor, stir for acid hydrolysis, the hydrolysis temperature is 96°C, and the hydrolysis time is 6 hours. After the reaction is completed, cool and filter to obtain the mixed solution; Trisodium phosphate solution is added to modify the pH of the mixed solution to 7 to obtain a gypsum retarder.
[0031] The desulfurization hemihydrate gypsum was mixed with the retarder (in terms of solid content) prepared in this example, and the water-material ratio was 0.58, and the setting time and strength performance tests were carried out.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com