Combined cast-in-place and prefabricated pipe gallery structure and its construction method
A comprehensive pipe gallery and combined technology, applied in the direction of infrastructure engineering, underwater structures, artificial islands, etc., can solve the problems of many structural blocks, formwork investment and cost increase, poor integrity and waterproof, etc., to achieve formwork The effect of less engineering, reduced workload, and simple appearance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0032] As shown in the figure, a comprehensive pipe gallery structure combining cast-in-place and prefabrication in this embodiment includes a cast-in-place bottom plate 1 horizontally arranged at the bottom of the foundation pit of the pipe gallery, and a cast-in-place bottom plate 1 arranged vertically on both sides of the pipe gallery. The first cast-in-place side wall 2, the first prefabricated partition wall 3 arranged vertically between the first cast-in-place side walls 2 on both sides and the cast-in-place bottom plate 1, erected above the first cast-in-place side walls 2 on both sides and The prefabricated middle plate 4 arranged parallel to the cast-in-place bottom plate 1, the second cast-in-place side wall 5 arranged on both sides of the prefabricated middle plate 4 perpendicular to it, and the second cast-in-place side wal...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


