Adjustable type forced centering device for sectional beam short ling method prefabricated measurement
A forced centering and adjustable technology, which is applied in the field of bridge engineering, can solve problems such as large amount of calculation, tedious adjustment work, uneven settlement, etc., and achieve the effect of reducing prefabrication measurement errors, avoiding repeated adjustments, and improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0020] The present invention is described in detail below in conjunction with accompanying drawing and specific embodiment:
[0021] like figure 1 and figure 2 An adjustable forced centering device for prefabricated measurement of segmental beams shown in the short-line method includes a three-slot centering plate 1, a center bolt 2, a pallet 4, and horizontal fine-tuning embedded bolts 6. The three-slot centering plate is Circular plate, the central bolt 2 is a lengthened universal adapter, the central bolt 2 passes through the center of the three-slot centering plate 1, and is connected with the inside of the three-slot centering plate 1, and is passed through two fastening bolts 3 at the bottom It is connected and fixed with the tray 4. The tray 4 is a rectangular plate, and the four corners of the tray 4 are respectively provided with pin holes 5. The diameter of the pin holes 5 is larger than the diameter of the horizontal fine-tuning embedded bolt 6, and there is a rou...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

