A shield tunnel segment and segment technology, which is used in tunnels, tunnel linings, earth-moving drilling, etc., can solve the problems that cannot ensure the safety and normal use of the existing shield tunnel structure, affect the settlement or deformation of the track structure in the tunnel, The waterproof effect of the joints of the segments is deteriorated, so as to improve the stability and engineering characteristics, strong applicability and operability, and improve the integrity and deformation resistance.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] First of all, before the adjacent or crossing construction, in the section that has a relatively large impact on the crossing or adjacent construction, for the segment within the range above the design rail surface line 2, through the reserved grouting hole on the segment, drill the back of the segment into the formation The grouting pipe 1 is used for grouting and reinforcing the strata behind the segments to improve the mechanical properties of the stratum behind the segment lining 10 .
[0051] Secondly, for segment longitudinal joints 3 and segment annular joints 4 above the design rail surface line 2, segment caulking 5 is implemented with high modulus polyurethane sealant to improve the waterproof effect of segment joints.
[0052] Thirdly, clean the dust on the inner surface of the segment lining 10 of the shield tunnel, and use the modified epoxy resin glue 8 to paste the hoop steel plate 6 on the inner surface of the segment above the designed rail surface line ...