A large-scale equipment and construction method technology, applied in the direction of building types, towers, buildings, etc., can solve the problems of unsuitable desulfurization absorption towers, etc., and achieve the effect of overcoming the difficulty of hoisting operations, solving the problem of large construction area and reducing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] In the ultra-low emission reconstruction project of No. 1 and No. 2 units of Yuheng Power Plant, the outlet of No. 1 absorption tower A needs to be adjusted and connected to a new absorption tower. Due to its large weight (65 tons), large size, and limited space, the large-scale absorption tower of the present invention is adopted. The equipment rotation construction method is a small-pitch overall steering method.
[0043] The scope of reconstruction of the outlet of the original absorption tower is: the top plate of the existing absorption tower A and the outlet flue to the expansion joint.
[0044] Engineering Features:
[0045] (1) The construction site is high, there is no protection around, and the construction site is limited.
[0046] (2) The part to be adjusted has a large mass and strict angle requirements.
[0047] 1. Materials and equipment
[0048] Table 1 Main materials and equipment
[0049]
[0050]
[0051] 2. Construction preparation
[0052...