The invention discloses a bridge production system. The bridge production system comprises a bridge body steel bar binding area, a bridge body pouring area and a gantry crane arranged on the bridge body steel bar binding area and the bridge body pouring area in a striding manner, and the gantry crane is provided with a lifting and moving device. Compared with the prior art, various bridge body prefabricated web steel bar binding table bases are provided in the scheme, bridge body steel bar framework binding is normalized and standardized, consumption of labor force is greatly reduced, the construction period is shortened, and integrity is high. The various bridge body prefabricated web steel bar binding table bases are formed by splicing steel structural pieces and can be cyclically used, the usage number of the binding table bases is reduced, the construction using land is reduced, and convenience is provided for field management. Rubber drawing and pulling bar penetrating construction can be rapidly finished through a rubber bar drawing and pulling device, a prestress hole channel is embedded, the labor intensity is low, and the work efficiency is high. In a side beam pouring tool, a first supporting plate of an effective supporting part can be independent, the size is small, the mass is low, operation is more flexible and is gradually changed during demolding, and therefore damage to concrete can be reduced.