[0023] Below, combine figure 2 with 3 , the transfer and installation method of the main bolt of the main pump of the AP1000 nuclear power plant of the present invention will be described in detail.
[0024] The transfer and installation method of the main bolts of the main pump of the AP1000 nuclear power plant, the method includes the following steps:
[0025] Step S1. After the main pump is in place, remove the top assembly used for installing the main pump on the main pump installation vehicle, and install the main bolt lifting device on the ring track on the main pump installation vehicle; Set the hoisting device on the vertical support of the device, such as figure 2 As shown, the lifting end of the lifting device 6 away from the vertical support 7 is provided with a lifting ear 61 . Preferably, the hoisting device 6 includes two mutually parallel hanging beams 62 and two connecting screw rods 63, and the connecting screw rods 63 are vertically connected to the hang...