A method for preventing alloy liquid leakage during the preparation of steel wire rope samples and a method for testing the breaking force of steel wire ropes
A technology of sample preparation and steel wire rope, which is applied in the test of the breaking force of steel wire rope and the field of preventing alloy liquid leakage, can solve problems such as molten liquid leakage, alloy liquid leakage, and affecting safe production, and achieve the effect of preventing leakage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] A method for preventing leakage of alloy liquid during the preparation of steel wire rope samples. The steel wire rope 300 is bundled near both ends. The binding part 310 divides the steel wire rope 300 into a pouring part 330 and a tensile test part 320. The pouring part 330 is located at the end of the steel wire rope 300 department. Then the pouring part 330 is opened to make it dispersed, and then the scattered pouring part 330 is fully cleaned to ensure that the steel wires from the binding part 310 to the end of the steel wire rope 300 are free of grease and foreign matter. Then the steel wire rope 300 is passed through the through hole of the mold 100 , so that the pouring part 330 of which one end of the steel wire rope 300 has been cleaned is located in the inner cavity of the mold 100 , and the through hole of the mold 100 is filled by the binding part 310 . Then fill the gap between the side of the binding part 310 close to the pouring part 330 and the outer ...
Embodiment 2
[0034] A method for preventing leakage of alloy liquid during the preparation of steel wire rope samples. The steel wire rope 300 is bundled near both ends. The binding part 310 divides the steel wire rope 300 into a pouring part 330 and a tensile test part 320. The pouring part 330 is located at the end of the steel wire rope 300 department. Then the pouring part 330 is opened to make it dispersed, and then the scattered pouring part 330 is fully cleaned to ensure that the steel wires from the binding part 310 to the end of the steel wire rope 300 are free of grease and foreign matter. Then the steel wire rope 300 is passed through the through hole of the mold 100 , so that the pouring part 330 of which one end of the steel wire rope 300 has been cleaned is located in the inner cavity of the mold 100 , and the through hole of the mold 100 is filled by the binding part 310 . Then fill the gap between the side of the binding part 310 near the pouring part 330 and the outer wall...
Embodiment 3
[0037] A method for preventing leakage of alloy liquid during the preparation of steel wire rope samples. The steel wire rope 300 is bundled near both ends. The binding part 310 divides the steel wire rope 300 into a pouring part 330 and a tensile test part 320. The pouring part 330 is located at the end of the steel wire rope 300 department. Then the pouring part 330 is opened to make it dispersed, and then the scattered pouring part 330 is fully cleaned to ensure that the steel wires from the binding part 310 to the end of the steel wire rope 300 are free of grease and foreign matter. Then the steel wire rope 300 is passed through the through hole of the mold 100 , so that the pouring part 330 of which one end of the steel wire rope 300 has been cleaned is located in the inner cavity of the mold 100 , and the through hole of the mold 100 is filled by the binding part 310 . Then fill the gap between the side of the binding part 310 near the pouring part 330 and the outer wall...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


