A construction method and equipment based on the lateral split start of shield tunneling in the underground excavation section
A technology of separate start and construction method, which is applied in mining equipment, shaft equipment, earthwork drilling and mining, etc., can solve the problems of large site demand, aggravated urban traffic congestion, and long duration, so as to achieve flexible start position and excavation Safety, fast construction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] like Figures 1 to 9 As shown in the figure, a construction method based on the lateral split of a shield tunnel in an undercut section includes the following steps:
[0041] S1: Install the shield base 31 in the shield assembly and excavation shaft 3;
[0042] S2: Assemble the front shield 11 and the middle shield 12 of the shield machine 1 in the shield assembly and excavation shaft 3, and the middle shield 12 is connected to the rear end of the front shield 11;
[0043] S3: The front shield 11 and the middle shield 12 of the shield machine 1 move forward at the same time, the front shield 11 moves to the upper end of the shield translation transverse channel 4, and the shield is assembled and unearthed in the shield shaft 3. The tail shield 13 is hoisted at the rear end of the middle shield 12;
[0044] S4: translate and adjust the posture of the shield machine 1 in the shield translation transverse channel 4, and the shield machine 1 moves to the junction of the s...
Embodiment 2
[0056] like figure 2 As shown, a construction structure based on the lateral split of the shield tunneling in the underground excavation section is used for the construction method based on the lateral splitting of the shield tunneling in the underground excavation section, and also includes:
[0057] Battery car unearthed transportation parking tunnel 9, shield assembly and unearthed shaft 3, shield translational cross passage 4, split starting trolley layout underground excavation tunnel 7, shield turning to underground excavation tunnel 5, shield tunnel starting position underground excavation 6. Shield tunnel 8;
[0058] The front end of the battery car unearthed transportation parking tunnel 9 is connected to the rear end of the shield assembly and the unearthed shaft 3, the top of the shield assembly and the unearthed shaft 3 is connected to the surface through a vertical shaft, and the shield assembly is connected to the unearthed shaft 3 The front end is connected wi...
Embodiment 3
[0062] like Figure 9 As shown, a construction equipment based on the lateral separation of the shield tunneling in the underground excavation section is used for the construction method based on the lateral separation of the shield tunneling in the underground excavation section, and also includes: a shield machine 1 and a shield tunneling machine Subsequent trolley device 2, the shield machine 1 includes a front shield 11, a middle shield 12, and a tail shield 13 that are detachably connected in sequence, and the subsequent trolley device 2 of the shield machine is connected to the shield machine 1 through a pipeline ;
[0063] It also includes a shield base 31, a shield reaction force frame 51, a battery car transport track 52 and a shield segment 81, the shield base is connected to the shield assembly and the bottom of the excavation shaft 3, and the battery car transport track 52 is detachably connected to the bottom of the shield turning underground excavation tunnel 5,...