Device for secondary grouting by utilizing shield synchronous grouting equipment
A synchronous grouting and secondary grouting technology, applied in mining equipment, shaft equipment, shaft lining, etc., can solve problems such as stagnation, failure to meet timeliness requirements, hidden safety hazards in tunnels, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The engineering background that the present invention relies on is the section of People's Hospital Station~Changhong Park Station of the 13th contract section of Tianjin Metro Line 6. The length of the right line of the section is 734.126m, the length of the left line is 733.745m, the maximum curve radius is 3000m, and the minimum is 2000m. The longitudinal section of the section is Single slope, the longitudinal slope of People’s Hospital Station and Changhong Park Station is 2‰, the longitudinal slope of the left line of the interval is -11.909‰; the longitudinal slope of the right line of the interval is -11.902‰, and the top of the interval is about 11.6~ 20m. The strata of this site are mainly artificial filling soil layer, recent alluvial layer, continental alluvial layer of Upper Holocene Formation, marine sedimentary layer of Middle Holocene Formation, swamp facies sedimentary layer of Lower Holocene Formation, and continental alluvial layer of Lower Holocene Fo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 