High-efficiency waste brick crushing device for construction
A technology of discarded bricks and crushing device, applied in the direction of grain processing, etc., can solve the problems of low efficiency, slow crushing speed, time-consuming and labor-intensive, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] A high-efficiency crushing device for waste bricks used in construction, such as Figure 1-3As shown, it includes bottom plate 1, crushing frame 2, left side plate 3, guide plate 4, slide rail 6, first slider 7, second slider 8, first connecting rod 9, horizontal plate 10, lifting mechanism 11 , top plate 12, reminding device 13, crushing plate 14 and crushing teeth 15, the crushing frame 2 is installed on the top of the bottom plate 1 through bolt connection, the left side plate 3 is installed on the left side of the top of the bottom plate 1 through bolt connection, the left side plate 3. A guide plate 4 is installed on the lower part of the right side through bolt connection. A guide hole 5 is opened on the right side of the guide plate 4. A slide rail 6 is installed on the upper part of the right side of the left side plate 3 through bolt connection. The slide rail 6 is Vertically arranged, the slide rail 6 is provided with a first slide block 7 and a second slide b...
Embodiment 2
[0026] A high-efficiency crushing device for waste bricks used in construction, such as Figure 1-3 As shown, it includes bottom plate 1, crushing frame 2, left side plate 3, guide plate 4, slide rail 6, first slider 7, second slider 8, first connecting rod 9, horizontal plate 10, lifting mechanism 11 , top plate 12, reminding device 13, crushing plate 14 and crushing teeth 15, the crushing frame 2 is installed on the top of the bottom plate 1 through bolt connection, the left side plate 3 is installed on the left side of the top of the bottom plate 1 through bolt connection, the left side plate 3. A guide plate 4 is installed on the lower part of the right side through bolt connection. A guide hole 5 is opened on the right side of the guide plate 4. A slide rail 6 is installed on the upper part of the right side of the left side plate 3 through bolt connection. The slide rail 6 is Vertically arranged, the slide rail 6 is provided with a first slide block 7 and a second slide ...
Embodiment 3
[0029] A high-efficiency crushing device for waste bricks used in construction, such as Figure 1-3 As shown, it includes bottom plate 1, crushing frame 2, left side plate 3, guide plate 4, slide rail 6, first slider 7, second slider 8, first connecting rod 9, horizontal plate 10, lifting mechanism 11 , top plate 12, reminding device 13, crushing plate 14 and crushing teeth 15, the crushing frame 2 is installed on the top of the bottom plate 1 through bolt connection, the left side plate 3 is installed on the left side of the top of the bottom plate 1 through bolt connection, the left side plate 3. A guide plate 4 is installed on the lower part of the right side through bolt connection. A guide hole 5 is opened on the right side of the guide plate 4. A slide rail 6 is installed on the upper part of the right side of the left side plate 3 through bolt connection. The slide rail 6 is Vertically arranged, the slide rail 6 is provided with a first slide block 7 and a second slide ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com