Unlock instant, AI-driven research and patent intelligence for your innovation.

BIM and calculation software bi-directionally connected structure design method

A computing software and structural design technology, applied in the direction of calculation, design optimization/simulation, special data processing applications, etc., can solve the problems of low efficiency, error-prone, and heavy workload in structural BIM design, and achieve structural design efficiency improvement and guarantee Quality and reliability, and the effect of improving work efficiency

Inactive Publication Date: 2017-07-21
SOUTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP CORP
View PDF4 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The essence of the first method is to calculate the software as the center, first perform structural calculations and then create BIM models and drawings. This method does not conform to the usual design process and cannot be widely used in structural design; read in the modified calculations from the BIM platform When making a model, it is necessary to compare the models to confirm whether the modification is based on the calculation model or remain unchanged. The operation is quite cumbersome; Parts, buttresses, markings, dimensioning, etc. need to be supplemented and modified accordingly. The workload is heavy and error-prone
In the second way, whenever the BIM model is changed, it needs to be checked and modified in the calculation software after it is rewritten into the calculation software, as well as to verify, modify and supplement the loads and related settings around the modification. cumbersome
In the third way, engineers need to keep in mind where the latest model is at all times to avoid the wrong direction, and after the BIM model is transferred to the calculation software, it is unavoidable to find and verify the surrounding loads and related settings of the modified place. Import it into BIM Calculation model can not solve the problem of model comparison and loss of associated primitives
[0004] It can be seen that the current connection method only simply realizes the conversion of part of the data between the BIM model and the calculation model, and does not make full use of the technical characteristics of the BIM platform, resulting in low structural BIM design efficiency, which can only meet the design requirements of construction drawings for simple structures , cannot be widely promoted in the BIM design of structures, resulting in the current situation that structural professionals are unwilling to actively adopt BIM technology for design

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be further described below in conjunction with the examples.

[0027] A structural design method for two-way communication between BIM and computing software, which specifically includes the following process: Step 1, establish a BIM three-dimensional model and view on the BIM platform; Step 2, specify a BIM analysis model on the BIM platform, and input the structure into the model All the information required for calculation; step 3, analyze the BIM analysis model on the BIM platform, and form the original data file of the calculation software; step 4, load the data file formed in the previous step in the calculation software, and perform structural calculation; step 5, in the View and analyze the calculation results in the calculation software, if they meet the specification requirements and engineering design requirements, go to step 6, otherwise return to step 1 for modification; step 6, read the calculation results in the BIM platform, and...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of structure design, and discloses a BIM and calculation software bi-directionally connected structure design method. The method comprises the following steps of: 1, establishing a BIM three-dimensional model and a view in a BIM platform; 2, appointing a BIM analysis model in the BIM platform, and inputting a structure in the model to calculate all the required information; 3, analyzing the BIM analysis model in the BIM platform so as to form a data file; 4, loading the data file formed in the last step in calculation software and carrying out structure calculation; 5, checking and analyzing the calculation result in the calculation software, if a standard requirement and an engineering design requirement are satisfied, going to step 6, and otherwise, returning to the step 1 to carry out modification; and 6, reading the calculation result in the BIM platform so as to generate a drawing and a table. According to the method, the structure design efficiency can be improved.

Description

technical field [0001] The invention relates to the technical field of structural design, in particular to a structural design method for bidirectional communication between BIM and computing software. Background technique [0002] As a new three-dimensional design technology, BIM ((Building Information Modeling) has gradually been widely used in the design, construction, operation and maintenance stages of engineering construction in the past ten years. However, in the engineering design stage, structural professional The use of BIM design is still very lagging behind. Usually, BIM models are passively created for professional use in construction, electromechanical, etc., and almost no active use of BIM technology for structural design. The reason is that the efficiency of using BIM technology for structural design is much lower than that of traditional two-dimensional design method. [0003] To this end, about 10 years of research have been carried out at home and abroad,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50
CPCG06F30/13G06F30/20
Inventor 严旭范盛颖周凯陈其春何姜江周光炳张晋宾唐茂平黄佑验薛江黄永军蒲涛侯克让
Owner SOUTHWEST ELECTRIC POWER DESIGN INST OF CHINA POWER ENG CONSULTING GROUP CORP