Construction method of bridge lower structure

A construction method and bridge technology, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of decreased firmness, loose cofferdam structure, weak impact resistance, etc., to increase stability and avoid water impact , the effect of structural stability

Active Publication Date: 2017-08-04
WENZHOU LONGSHANG CONSTR CO LTD
View PDF9 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The construction of bridge foundations includes construction techniques such as open-cut foundations, bored pile foundations, and caisson foundations. In the process of building bridges in rivers, cofferdams can play a certain role in enclosure. Cofferdams are generally Refers to the temporary enclosure structure built for the construction of permanent water conservancy facilities in the construction of water conservancy projects. Its function is to prevent water and soil from entering the construction site of the building, so as to drain water in the cofferdam, excavate foundation pits, and build buildings. objects, etc., except as a part of the formal building, the cofferdam is generally dismantled after use, but the general cofferdam structure is relatively loose, the impact resistance is not strong, and the cofferdam built on the turbulent river is subject to greater impact. Therefore, how to build a stable cofferdam on the basis of water and create convenience for the construction of the substructure of the bridge is a difficult problem in bridge construction at present.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of bridge lower structure
  • Construction method of bridge lower structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0027] Refer to attached figure 1 , a construction method for a bridge substructure, comprising the steps of:

[0028] a: Use a vibrating hammer to install steel pipe positioning piles around the required cofferdam. The positioning piles are 600mm positioning piles, which are driven by a vibrating hammer. Two guide frames are installed between the steel pipe positioning piles to vibrate in the guide frame Hammer the steel sheet pile 1, lift the assembled steel sheet pile 1 with the pile frame, and vibrate the hammer to drive. When inserting the steel sheet pile 1, the verticality of the pile must be strictly controlled, especially the first group of piles must be from two sides. Two mutually perpendicular directions are controlled at the same time to ensure that the vertical is not biased. After the steel sheet pile 1 is started to be inserted, the guide fr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a construction method of a bridge lower structure. The key point of the technical scheme is that cotton slivers or sealing strips are embedded in the inner sides between adjacent steel sheet piles; c, a triangular water guiding plate is mounted on one side of a guide frame along the direction of water flow; d, a water pump enters a cofferdam for discharging internal accumulated water, concrete layers are poured at the bottoms of the steel sheet piles of the cofferdam; and e, backfilled soil is backfilled to form a foundation pit in the cofferdam, the pit wall which the two sides having slopes is excavated in the cofferdam, gravel layers are backfilled in the slopes, so that the outer sides of the gravel layers are perpendicular to the bottom of the foundation pit, a fender is fixed to the outside of the backfilled soil, column piles are attached to the outer side of the fender, anchor piles are obliquely inserted on both sides of the foundation pit, the anchor piles are connected with the column piles through steel wires, the cofferdam of the bridge is tight in waterproof performance, and construction of the foundation pit at the bottom is more stable.

Description

technical field [0001] The invention relates to the field of bridge construction, in particular to a construction method for a bridge substructure. Background technique [0002] The construction of bridge foundations includes construction techniques such as open-cut foundations, bored pile foundations, and caisson foundations. In the process of building bridges in rivers, cofferdams can play a certain role in enclosure. Cofferdams are generally Refers to the temporary enclosure structure built for the construction of permanent water conservancy facilities in the construction of water conservancy projects. Its function is to prevent water and soil from entering the construction site of the building, so as to drain water in the cofferdam, excavate foundation pits, and build buildings. objects, etc., except as a part of the formal building, the cofferdam is generally dismantled after use, but the general cofferdam structure is relatively loose, the impact resistance is not stro...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
CPCE01D21/00
Inventor 郭玉霞黄小虎江会平
Owner WENZHOU LONGSHANG CONSTR CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products