Bridge pile foundation construction method

A construction method and pile foundation technology, which can be applied in the direction of foundation structure engineering, sheet pile walls, buildings, etc., can solve the problems of tunnels prone to collapse and large tunnels, and achieve the effect of avoiding tunnel collapse and enhancing sealing performance

Active Publication Date: 2019-01-18
ZHEJIANG MINGTONG CONSTR ENG CO LTD
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Especially in deep water areas, the side walls of the channel are under greater pressure, and the channel is more prone to collapse, which needs to be improved

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge pile foundation construction method
  • Bridge pile foundation construction method
  • Bridge pile foundation construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The present invention will be described in further detail below in conjunction with the accompanying drawings.

[0037] A bridge pile foundation construction method, comprising the steps of:

[0038] Step 1: Lift the concrete casing to the pile position, make the concrete casing vertical, and slowly sink the concrete casing vertically until it is stable in the mud. At this time, the upper end of the concrete casing is below the water surface;

[0039] Step 2: Use a vibrating hammer to vibrate the concrete casing to sink the concrete casing to the design depth;

[0040] Step 3: In the concrete casing, use a drilling rig to repeatedly impact the slurry to make drilling, clean the hole in time after the final hole, form a tunnel, and tamp the inner wall of the tunnel;

[0041] Step 4: Lower the prefabricated reinforcement cage first, then lower the concrete pouring conduit 1 to the bottom near the tunnel, start pouring concrete after cleaning the hole for the second time,...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method of a bridge pile foundation. The method comprises the following steps: 1, hoisting a concrete protecting tube to a pile position to ensure that the concrete protecting tube is perpendicular, slowly and perpendicularly sinking the concrete protecting tube into mud to stabilize, and ensuring that the upper end of the concrete protecting tube is positioned below the water level; 2, applying vibration of the concrete protective tube by utilizing a vibrating hammer to ensure that the concrete protective tube is sunken into the designed depth; 3, repeatedly impacting, pulping and drilling the internal parts of the concrete protective tube by adopting a drilling machine, clearing holes in time after hole is drilled eventually to form a hole path, and carrying out compaction of the inner wall of the hole path; 4, descending a prefabricated reinforcement cage firstly, and then descending a bored concrete guide pipe to the bottom close to the hole path, and starting to pour concrete after secondary hole clearing to complete construction. The method has the beneficial effects that the construction method of the bridge pile foundation can avoid the phenomenon that the hole path is collapsed due to the pressure of water, so that additional strengthening support of the hole path is not needed; moreover, the construction method has the advantages of energy conservation and environment protection.

Description

technical field [0001] The invention relates to a bridge construction method, in particular to a bridge pile foundation construction method. Background technique [0002] With the rapid development of the economy, the demand for transportation is increasing rapidly, and there are more and more large bridges across the sea and across the river. Bored piles with high bearing capacity and stable quality are the preferred foundation form for most bridge projects. The construction of bored pile foundation is the basic link of the whole bridge construction process, and it is also an extremely important link. [0003] The Chinese patent whose publication number is CN105386408A discloses a construction method for deep-water bridge pile foundations. In this construction method, after the steel casing reaches the designed depth, the bottom-sealing concrete of the steel casing is poured to seal the gap between the bottom of the steel casing and the bedrock. Afterwards, grouting and ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D27/12E02D5/38
CPCE02D5/38E02D27/12
Inventor 冯明理
Owner ZHEJIANG MINGTONG CONSTR ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products