Method and system of delayed response of dispatching master station of telecontrol device

A technology for dispatching master stations and delaying response, applied in transmission systems, circuit devices, information technology support systems, etc., can solve misadjustment or miscontrol of the power grid, inaccurate empirical values ​​of telecontrol device delays, and unfavorable on-site maintenance Work and other issues

Active Publication Date: 2017-09-26
POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The embodiment of the present invention provides a method and a telecontrol device for a telecontrol device to delay the response to the dispatching master station, which solves the problem of adopting a fixed delay method to respond to the dispatching master station based on the actual power grid operation experience to avoid errors in the initialization process. If the data exists, it needs to be modified synchronously according to the site conditions. The fixed delay is not conducive to on-site maintenance work. The experience value of the delay of the telecontrol device is not accurate, which may lead to misadjustment or miscontrol of the power grid, which will bring huge losses to the power grid.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system of delayed response of dispatching master station of telecontrol device
  • Method and system of delayed response of dispatching master station of telecontrol device
  • Method and system of delayed response of dispatching master station of telecontrol device

Examples

Experimental program
Comparison scheme
Effect test

no. 1 example

[0051] see figure 1 , the embodiment of the present invention provides a first embodiment of a method for delaying the response of a telecontrol device to dispatch a master station, including:

[0052] S101. Complete the first remote start-up within the preset first remote start-up time, wherein the first remote start-up specifically includes manual intervention start-up, hardware and operating system start-up, application basic software initialization, and application communication software initialization.

[0053] S102, carry out communication building with all measurement and control devices according to the preset sequence, compare the measurement and control devices that have completed the communication with the measurement and control devices recorded in the forwarding table of the dispatching master station in real time, if the data recorded in the forwarding table All the measurement and control devices have completed the communication database building, and then respo...

no. 2 example

[0062] see figure 2 , the embodiment of the present invention provides a second embodiment of the method for delaying the response of the telecontrol device to dispatch the master station, including:

[0063] S201. Complete the first remote control activation within the preset first remote control activation time, wherein the first remote control activation specifically includes manual intervention activation, hardware and operating system activation, application basic software initialization, and application communication software initialization.

[0064] The first remote control start specifically includes manual intervention start, hardware and operating system start, application basic software initialization, and application communication software initialization. The corresponding first remote control start time includes reserved intervention time, hardware and operating system start time, application base Software accident time, application communication software initial...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method and system of delayed response of a dispatching master station of a telecontrol device. The method comprises the following steps: completing a first telecontrol start within a preset first telecontrol start time; sequentially establishing databases through communication with all measuring and control devices in preset sequence; making comparison between the measuring and control devices with the databases established through communication and measuring and control devices recorded in a forwarding table of the dispatching master station; responding the dispatching master station corresponding to the forwarding table if the databases are established through communication for all the measuring and control devices recorded in forwarding table. According to the method and the system, when a constant delay method is adopted for responding the dispatching master station to avoid generation of error data in an initialization process according to the actual operating experience of the power grid, the existing technical problem that huge loss is caused for a power grid due to misadjustment or mistaken control for the power grid possibly caused by the situations that the synchronous modification of constant delay is bad for on-site maintenance work according to site conditions, and the empirical value of delay of the telecontrol device is inaccurate is solved.

Description

technical field [0001] The invention relates to the field of integrated automation systems of substations, in particular to a method and system for dispatching a master station with a delayed response of a telecontrol device. Background technique [0002] In the substation integrated automation system, the telecontrol device is an automatic device for completing the collection of various information between dispatching and substations and automatically transmitting and exchanging them in real time. It is the basis for the comprehensive automation of power system dispatching. The stability and Data accuracy directly affects the safe and stable operation of the power grid. [0003] After restarting, the remote control device needs to perform data initialization process. During the initialization period, the remote control device establishes communication with the measurement and control device in the station and calls for data. During the period when the initialization is not...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04L29/08H02J13/00
CPCH02J13/0013H04L67/12H04L67/62Y04S10/16Y02E60/00
Inventor 武天龙赵瑞锋卢建刚李波
Owner POWER DISPATCHING CONTROL CENT OF GUANGDONG POWER GRID CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products