A method of producing oil and gas
A technology of oil and gas and tubing, which is applied in the field of oil and gas field exploitation. It can solve the problems of affecting the economic benefits of oil and gas fields, reducing the production efficiency of oil and gas wells, and increasing operating costs, so as to achieve the effect of reducing operation risks, reducing operation time and operating costs, and reducing pollution.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 2 example
[0083] Such as Figure 6 As shown, it is a schematic structural diagram according to the second embodiment of the present invention. The second embodiment differs from the first embodiment only in the opening mechanism. In the second embodiment, the opening mechanism mainly comprises a wedge plug 14a and a wedge plug shear pin 13a. The tapered surface of the wedge plug 14a interferes with the inner tapered surface of the lower joint 12 and is positioned by the wedge plug shear pin 13a. The area of the upper end surface of the wedge plug 14a is small and the area of the lower end surface is large, and the lower end surface is subjected to formation pressure The wedge-shaped plug 14a will not accidentally break away from the mandrel 1.
[0084] Preferably, the wedge plug 14a is made of rubber-like material that can withstand high pressure and seal.
no. 3 example
[0086] Such as Figure 7 and Figure 7A As shown, it is a structural schematic diagram of the third embodiment and a structural schematic diagram of a spliced wedge plug according to the present invention. The third embodiment differs from the second embodiment only in the opening mechanism. In the third embodiment, the opening mechanism mainly includes two spliced wedge plugs 14b and two wedge plug shear pins 13b. The tapered surfaces of the spliced two wedge-shaped plugs 14b interfere with the inner tapered surfaces of the lower joint 12 and are positioned by the wedge-shaped plug shear pins 13a. The wedge-shaped plug 14b will not accidentally break away from the mandrel 1 due to formation pressure.
[0087] In the process of running into the tubing 200, the wedge plug shear pin 13a is sheared by applying pressure to the tubing 200, and the wedge plug 14b is driven into the bottom of the well against the frictional force of the interference fit. The advantage of us...