BIM based project supervision information management system

A technology of information management and supervision, applied in office automation, data processing applications, electrical digital data processing, etc., can solve the problems of low efficiency of information transmission, difficulty in mastering dynamic information, etc., and achieve the effect of easy understanding and improved efficiency

Inactive Publication Date: 2017-12-26
南通市交通建设咨询监理有限公司
View PDF4 Cites 17 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the large number of units and departments involved in project management, the efficiency of information transmission is very low in traditional methods such as holding meetings and issuing documents, and it is very difficult to grasp dynamic information in a timely manner.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM based project supervision information management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0040] Embodiment: a kind of engineering supervision information management system based on BIM, such as figure 1 As shown, including the background database, the background database stores BIM model data and work log data. The background database is connected to the cloud server, and the cloud server can update the data in the background database. The cloud server also includes an automatic feedback module and a change detection system, and the change detection system is connected to the automatic feedback module. The automatic feedback module also includes a classification module and a transmission module. The system also includes a mobile terminal and a WEB server, and the mobile terminal and the WEB server are respectively connected to the cloud server. The WEB server can log in multiple accounts, and multiple accounts correspond to multiple departments. The mobile terminal includes a wireless transmission module, a scanning module, a BIM model, a comparison module and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a BIM based project supervision information management system. The system includes a background database, a cloud server, a WEB service terminal and a mobile terminal. The mobile terminal also includes a wireless transmission module, a scanning module and a comparison module. The comparison module is connected with the scanning module and the wireless transmission module and is used for determining difference between practical working conditions and a BIM model through comparison and transmitting the field working conditions to the cloud server through the wireless transmission module when the difference between the practical working conditions and the BIM model is greater than a preset numerical value. The system has beneficial effects that the field working conditions can be reflected at any time and in any place by a worker during a working process by utilizing a mobile terminal, so that information communication efficiency is improved and different departments can know dynamic information timely. At the same time, understanding is facilitated through combination of the field working conditions and the BIM model.

Description

technical field [0001] The invention relates to an engineering supervision information management system, in particular to a BIM-based engineering supervision information management system. Background technique [0002] BIM is the abbreviation of building information model. It is based on various information data of construction projects to establish a three-dimensional building model and simulate the real information of buildings through digital information simulation. BIM has eight characteristics of completeness of information, relevance of information, consistency of information, visualization, coordination, simulation, optimization and mapability. The construction unit, design unit, construction unit, supervision unit and other project participants are on the same platform and share the same building information model. It is conducive to project visualization and refined construction. [0003] The construction project supervision unit is entrusted by the construction ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08G06F17/30
CPCG06Q10/0631G06F16/252G06Q10/103G06Q50/08
Inventor 钱晓彬刘疆宁严叙
Owner 南通市交通建设咨询监理有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products