A construction method of piercing cutting grooves through the brow line opening of steel bars in the chamber
A construction method and technology of cutting slots, which are applied in underground chambers, earthwork drilling, shaft equipment, etc., and can solve the difficulties of setting up platforms and charging charges in the middle and deep holes in the back row, hidden dangers of manual charging, and large cutting slot sections, etc. To avoid the difficulty of setting up the platform, ensure normal blasting, and reduce landfill
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] A construction method for piercing cutting grooves to pass through the brow line opening of steel bars in a chamber, comprising the following steps:
[0029] 1) Determine the construction cutting groove: select the piercing cutting groove as the transportation piercer and include at least one chamber for construction, and the piercing cutting groove is a three-core arch section;
[0030] 2) Determine the construction position of the reinforcement brow line opening: select the half-row position behind the current blasting position to start construction;
[0031] 3) Construction: For the arch construction anchors corresponding to the construction positions determined in step (2), construct a group of anchors at intervals of 1m along the arch length direction, each group has two anchors, and the distance between the two anchors in each group 150mm, the steel plate is fixedly connected to the group of anchor rods, and several groups of anchor rods together form the eyebrow ...
Embodiment 2
[0033] A construction method for piercing cutting grooves to pass through the brow line opening of steel bars in a chamber, comprising the following steps:
[0034] 1) Determine the construction cutting groove: select the piercing cutting groove as the transportation piercer and include at least one chamber for construction, and the piercing cutting groove is a three-core arch section;
[0035] 2) Determine the construction position of the reinforcement brow line opening: select the half-row position behind the current blasting position to start construction;
[0036] 3) Construction: For the arch construction anchors corresponding to the construction positions determined in step (2), construct a group of anchors at intervals of 1m along the arch length direction, and each group of anchors has two (the connection between the two anchors The line is perpendicular to the direction of the arch length), the distance between the two anchor rods of each group is 250mm, and the steel...
Embodiment 3
[0038] A construction method for piercing cutting grooves to pass through the brow line opening of steel bars in a chamber, comprising the following steps:
[0039] 1) Determine the construction cutting groove: select the vein cutting groove as the transportation piercing groove and at least include one chamber for construction, the piercing cutting groove is a three-heart arch section; the specification of the piercing cutting groove is Net width x net height: 3.4m x 3.3m, arch length 4.52m.
[0040] 2) Determine the construction position of the reinforcement brow line opening: select the position 0.5m after the current blasting position to start construction;
[0041] 3) Construction: For the arch construction anchors corresponding to the construction positions determined in step (2), construct a group of anchors at intervals of 1m along the arch length direction, each group has two anchors, and the distance between the two anchors in each group 200mm, the steel plate is we...